The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for September 7, 2013

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100     *  
Beaver Valley 2 100     *  
Calvert Cliffs 1 100     *  
Calvert Cliffs 2 0 09/05/2013 TS REQUIRED SHUTDOWN. SEE EN #49323 *  
FitzPatrick 55   REDUCED POWER FOR REACTOR FEED PUMP 'B' REPAIRS *  
Ginna 100        
Hope Creek 1 76   REDUCED POWER FOR TURBINE VALVE TESTING HIGH SYSTEM VOLTAGE ACTION *  
Indian Point 2 100   13.8 KV LINE 33332LM OOS    
Indian Point 3 100   13.8 KV LINE 33332LM OOS    
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 83   COASTDOWN TO REFUELING OUTAGE *  
Pilgrim 1 76   HOLDING POWER TO REPAIR FW PUMP    
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 100   HIGH SYSTEM VOLTAGE ACTION *  
Susquehanna 2 68   INCREASING POWER AFTER ROD SEQUENCE EXCHANGE HIGH SYSTEM VOLTAGE ACTION *  
Three Mile Island 1 100   HIGH SYSTEM VOLTAGE ACTION *  
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 80   REDUCED POWER FOR PLANNED MAINTENANCE *  
Browns Ferry 3 100        
Brunswick 1 70   REDUCED POWER FOR ROD SEQUENCE EXCHANGE *  
Brunswick 2 100        
Catawba 1 100        
Catawba 2 95   T AVE DECREASE IN PREPARATION FOR OUTAGE *  
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100     *  
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100     *  
D.C. Cook 2 100     *  
Davis-Besse 100     *  
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100   LOAD LINE ADJUSTMENT *  
Fermi 2 68   RX FEEDPUMP ISSUES    
La Salle 1 100        
La Salle 2 100        
Monticello 99   RECIRC PUMP RUNBACK EN #49316    
Palisades 100        
Perry 1 0 09/06/2013 MAINTENANCE OUTAGE *  
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 81   REDUCED POWER FOR GENERATOR VIBRATION ISSUE    
Quad Cities 1 100        
Quad Cities 2 72   DECREASED POWER FOR PLANNED MAINTENANCE *  

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 70   ROD SEQUENCE EXCHANGE *  
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 04/09/2011 REFUELING OUTAGE - FUEL LOADING COMPLETE    
Grand Gulf 1 100        
Palo Verde 1 98   FEEDWATER HEATER MAINTENANCE *  
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
South Texas 1 87   FEEDWATER HEATER/CONDENSER BELLOWS ISSUE    
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.