Power Reactor Status Report for June 30, 2013
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | * | |||
Calvert Cliffs 2 | 100 | * | |||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | 13.8 KV LINE 33332LM OOS | |||
Indian Point 3 | 100 | 13.8 KV LINE 33332LM OOS | |||
Limerick 1 | 100 | * | |||
Limerick 2 | 100 | * | |||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | * | |||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 100 | ||||
Salem 1 | 100 | * | |||
Salem 2 | 100 | * | |||
Seabrook 1 | 100 | ||||
Susquehanna 1 | 100 | * | |||
Susquehanna 2 | 100 | * | |||
Three Mile Island 1 | 100 | * | |||
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | ||||
Browns Ferry 2 | 100 | ||||
Browns Ferry 3 | 100 | ||||
Brunswick 1 | 100 | ||||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 71 | INCREASING POWER | * | ||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 100 | ||||
Summer | 100 | * | |||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 100 | ||||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 0 | 06/28/2013 | FORCED OUTAGE - AUTOMATIC REACTOR TRIP DUE TO OFFSITE ELECTRICAL FAULT - SEE EN #49154 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | * | |||
Braidwood 2 | 0 | 06/28/2013 | MAINTENANCE OUTAGE - RCP SEAL REPAIR IN PROGRESS | * | |
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 100 | * | |||
D.C. Cook 2 | 100 | * | |||
Davis-Besse | 0 | 06/29/2013 | FORCED OUTAGE - AUTOMATIC REACTOR TRIP DUE TO REACTOR COOLANT PUMP TRIP - SEE EN #49159 | * | 1 |
Dresden 2 | 100 | * | |||
Dresden 3 | 100 | * | |||
Duane Arnold | 100 | * | |||
Fermi 2 | 68 | RX FEEDPUMP ISSUES | |||
La Salle 1 | 100 | * | |||
La Salle 2 | 100 | * | |||
Monticello | 0 | 03/01/2013 | REFUELING OUTAGE | ||
Palisades | 100 | ||||
Perry 1 | 100 | * | |||
Point Beach 1 | 100 | ||||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | * | |||
Prairie Island 2 | 80 | REDUCED POWER FOR GENERATOR VIBRATION ISSUE | * | ||
Quad Cities 1 | 100 | * | |||
Quad Cities 2 | 100 | * |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 0 | 03/24/2013 | REFUELING OUTAGE | ||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 92 | HOLDING POWER DUE TO VIBRATION PROBLEMS WITH "B" RECIRC PUMP | * | ||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 90 | INCREASING POWER TO 100% | * | ||
Diablo Canyon 1 | 0 | 06/26/2013 | FORCED OUTAGE - ANTICIPATE RESTART WITHIN THE NEXT 24 HOURS | * | |
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 0 | 04/09/2011 | REFUELING OUTAGE | ||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 100 | ||||
River Bend 1 | 100 | ||||
San Onofre 2 | 0 | 01/09/2012 | PERMANENT PLANT SHUTDOWN | ||
San Onofre 3 | 0 | 01/31/2012 | PERMANENT PLANT SHUTDOWN | ||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |