The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for June 9, 2013

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 0 05/27/2013 FORCED OUTAGE - ANTICIPATE RESTART ON DAYSHIFT 6/9 *  
Calvert Cliffs 1 100   HIGH SYSTEM VOLTAGE    
Calvert Cliffs 2 100   HIGH SYSTEM VOLTAGE    
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100   13.8 KV LINE 33332LM OOS    
Indian Point 3 100   13.8 KV LINE 33332LM OOS *  
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 6   INCREASING POWER TO 16% FOR TURBINE ROLL AND TESTING - HIGH SYSTEM VOLTAGE *  
Susquehanna 2 68   INCREASING POWER - HIGH SYSTEM VOLTAGE *  
Three Mile Island 1 100   HIGH SYSTEM VOLTAGE ACTION    
Vermont Yankee 99   INCREASING POWER TO 100% *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100     *  
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Farley 1 100        
Farley 2 100        
Harris 1 100     *  
Hatch 1 100     *  
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 84   INCREASING POWER TO 100% *  
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100   HIGH VOLTAGE SYSTEM ACTION    
D.C. Cook 2 100   HIGH VOLTAGE SYSTEM ACTION *  
Davis-Besse 100   HIGH SYSTEM VOLTAGE *  
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 68   HOLDING - RX FEEDPUMP ISSUES    
La Salle 1 100        
La Salle 2 100        
Monticello 0 03/01/2013 REFUELING OUTAGE    
Palisades 0 05/05/2013 FORCED OUTAGE - TECH SPEC REQUIRED SHUTDOWN; SEE EN #49002    
Perry 1 60   REDUCED POWER FOR POWER SUPPRESSION TESTING *  
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 82   REDUCED POWER FOR GENERATOR VIBRATION ISSUE *  
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 0 03/24/2013 REFUELING OUTAGE    
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 0 05/11/2013 REFUELING OUTAGE    
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 85   SLOWLY INCREASING POWER TO 100% *  
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 04/09/2011 REFUELING OUTAGE    
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 0 01/09/2012 PERMANENT PLANT SHUTDOWN    
San Onofre 3 0 01/31/2012 PERMANENT PLANT SHUTDOWN    
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.