Power Reactor Status Report for April 27, 2013
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Beaver Valley 1 |
100 |
|
|
|
|
Beaver Valley 2 |
100 |
|
|
|
|
Calvert Cliffs 1 |
100 |
|
HIGH SYSTEM VOLTAGE ALERT |
* |
|
Calvert Cliffs 2 |
100 |
|
HIGH SYSTEM VOLTAGE ALERT |
* |
|
FitzPatrick |
100 |
|
|
|
|
Ginna |
100 |
|
|
|
|
Hope Creek 1 |
100 |
|
HIGH SYSTEM VOLTAGE ACTION |
* |
|
Indian Point 2 |
100 |
|
13.8 KV LINE 33332LM OOS |
|
|
Indian Point 3 |
100 |
|
13.8 KV LINE 33332LM OOS |
* |
|
Limerick 1 |
100 |
|
|
|
|
Limerick 2 |
100 |
|
|
|
|
Millstone 2 |
100 |
|
|
|
|
Millstone 3 |
0 |
04/13/2013 |
REFUELING OUTAGE |
|
|
Nine Mile Point 1 |
0 |
04/14/2013 |
REFUELING OUTAGE |
* |
|
Nine Mile Point 2 |
100 |
|
|
|
|
Oyster Creek |
100 |
|
|
|
|
Peach Bottom 2 |
100 |
|
|
|
|
Peach Bottom 3 |
62 |
|
SCHEDULED LOAD DROP |
* |
|
Pilgrim 1 |
0 |
04/14/2013 |
REFUELING OUTAGE |
|
|
Salem 1 |
0 |
04/14/2013 |
REFUELING OUTAGE |
|
|
Salem 2 |
100 |
|
|
|
|
Seabrook 1 |
100 |
|
ONE CONTINGENCY AWAY FROM BEING LIMITED TO 800MW |
|
|
Susquehanna 1 |
96 |
|
VOLTAGE REGULATOR IN MANUAL - OUTPUT LIMITED TO 1300 MWE BY GRID OPERATOR - HIGH SYSTEM VOLTAGE ACTION |
* |
|
Susquehanna 2 |
0 |
04/13/2013 |
REFUELING OUTAGE - HIGH SYSTEM VOLTAGE ACTION |
* |
|
Three Mile Island 1 |
100 |
|
HIGH SYSTEM VOLTAGE ACTION |
* |
|
Vermont Yankee |
100 |
|
|
|
|
Region 2
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Browns Ferry 1 |
100 |
|
|
|
|
Browns Ferry 2 |
0 |
03/14/2013 |
EXITING REFUEL OUTAGE |
|
|
Browns Ferry 3 |
100 |
|
|
|
|
Brunswick 1 |
100 |
|
|
|
|
Brunswick 2 |
0 |
03/02/2013 |
REFUELING OUTAGE |
|
|
Catawba 1 |
100 |
|
|
|
|
Catawba 2 |
100 |
|
|
|
|
Crystal River 3 |
0 |
02/03/2013 |
DEFUELED |
|
|
Farley 1 |
100 |
|
|
|
|
Farley 2 |
0 |
04/14/2013 |
REFUELING OUTAGE - CORE RELOADED |
* |
|
Harris 1 |
92 |
|
INCREASING POWER TO 99% AND HOLDING TO INVESTIGATE HEATER DRAIN ISSUE |
* |
|
Hatch 1 |
100 |
|
MONITORING SAFETY RELIEF VALVES |
|
|
Hatch 2 |
100 |
|
|
|
|
McGuire 1 |
100 |
|
|
* |
|
McGuire 2 |
100 |
|
|
|
|
North Anna 1 |
100 |
|
|
|
|
North Anna 2 |
0 |
04/06/2013 |
REFUELING OUTAGE - CORE RELOAD IN PROGRESS |
* |
|
Oconee 1 |
100 |
|
|
|
|
Oconee 2 |
100 |
|
|
|
|
Oconee 3 |
100 |
|
|
|
|
Robinson 2 |
100 |
|
|
|
|
Saint Lucie 1 |
100 |
|
|
|
|
Saint Lucie 2 |
100 |
|
|
|
|
Sequoyah 1 |
100 |
|
|
|
|
Sequoyah 2 |
100 |
|
|
|
|
Summer |
100 |
|
|
|
|
Surry 1 |
100 |
|
|
|
|
Surry 2 |
100 |
|
|
|
|
Turkey Point 3 |
100 |
|
|
|
|
Turkey Point 4 |
29 |
|
HOLDING POWER FOR TESTING |
|
|
Vogtle 1 |
100 |
|
|
|
|
Vogtle 2 |
100 |
|
|
|
|
Watts Bar 1 |
100 |
|
|
|
|
Region 3
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
100 |
|
|
|
|
Braidwood 2 |
100 |
|
|
|
|
Byron 1 |
100 |
|
|
|
|
Byron 2 |
0 |
04/07/2013 |
REFUELING OUTAGE |
|
|
Clinton |
0 |
04/26/2013 |
FORCED OUTAGE
SEE EVENT #48974 |
* |
1 |
D.C. Cook 1 |
0 |
03/26/2013 |
REFUELING OUTAGE
HIGH SYSTEM VOLTAGE ACTION |
* |
|
D.C. Cook 2 |
100 |
|
HIGH SYSTEM VOLTAGE ACTION |
* |
|
Davis-Besse |
100 |
|
|
|
|
Dresden 2 |
100 |
|
|
|
|
Dresden 3 |
100 |
|
|
|
|
Duane Arnold |
100 |
|
|
|
|
Fermi 2 |
0 |
04/27/2013 |
MAINTENANCE OUTAGE |
* |
|
Kewaunee |
100 |
|
|
|
|
La Salle 1 |
0 |
04/17/2013 |
MAKING PREPARATIONS FOR START-UP |
* |
|
La Salle 2 |
0 |
04/25/2013 |
MANUAL RX SCRAM. SEE EN #48969 |
|
|
Monticello |
0 |
03/01/2013 |
REFUELING OUTAGE |
|
|
Palisades |
100 |
|
|
|
|
Perry 1 |
0 |
03/17/2013 |
REFUELING OUTAGE
CORE RELOAD COMPLETE |
|
|
Point Beach 1 |
100 |
|
|
* |
|
Point Beach 2 |
100 |
|
|
|
|
Prairie Island 1 |
100 |
|
|
|
|
Prairie Island 2 |
100 |
|
|
|
|
Quad Cities 1 |
100 |
|
|
|
|
Quad Cities 2 |
100 |
|
|
|
|
Region 4
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Arkansas Nuclear 1 |
0 |
03/24/2013 |
REFUELING OUTAGE |
|
|
Arkansas Nuclear 2 |
0 |
03/31/2013 |
STARTUP IN PROGRESS |
* |
|
Callaway |
0 |
04/08/2013 |
REFUELING OUTAGE |
|
|
Columbia Generating Station |
100 |
|
|
|
|
Comanche Peak 1 |
100 |
|
|
|
|
Comanche Peak 2 |
100 |
|
|
|
|
Cooper |
100 |
|
|
|
|
Diablo Canyon 1 |
100 |
|
|
|
|
Diablo Canyon 2 |
100 |
|
|
|
|
Fort Calhoun |
0 |
04/09/2011 |
DEFUELED |
|
|
Grand Gulf 1 |
100 |
|
|
|
|
Palo Verde 1 |
0 |
03/30/2013 |
REFUELING OUTAGE |
|
|
Palo Verde 2 |
100 |
|
|
|
|
Palo Verde 3 |
100 |
|
|
|
|
River Bend 1 |
100 |
|
|
* |
|
San Onofre 2 |
0 |
01/09/2012 |
REFUELING OUTAGE |
|
|
San Onofre 3 |
0 |
01/31/2012 |
FORCED OUTAGE - S/G REPAIR |
|
|
South Texas 1 |
100 |
|
|
|
|
South Texas 2 |
100 |
|
|
|
|
Waterford 3 |
0 |
04/26/2013 |
FORCED OUTAGE |
* |
|
Wolf Creek 1 |
100 |
|
|
|
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
|