The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for April 25, 2013

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100   HIGH SYSTEM VOLTAGE ACTION *  
Indian Point 2 100   13.8 KV LINE 33332LM OOS    
Indian Point 3 100   138 KV LINE 33332LM OOS    
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 0 04/13/2013 REFUELING OUTAGE    
Nine Mile Point 1 0 04/14/2013 REFUELING OUTAGE    
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100     *  
Pilgrim 1 0 04/14/2013 REFUELING OUTAGE    
Salem 1 0 04/14/2013 REFUELING OUTAGE *  
Salem 2 100        
Seabrook 1 100   ONE CONTINGENCY AWAY FROM BEING LIMITED TO 800MW    
Susquehanna 1 96   VOLTAGE REGULATOR IN MANUAL - OUTPUT LIMITED TO 1300 MWE BY GRID OPERATOR. HIGH SYSTEM VOLTAGE ACTION *  
Susquehanna 2 0 04/13/2013 REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION *  
Three Mile Island 1 100   HIGH SYSTEM VOLTAGE ACTION *  
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 0 03/14/2013 EXITING REFUEL OUTAGE    
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 0 03/02/2013 REFUELING OUTAGE *  
Catawba 1 100        
Catawba 2 100        
Crystal River 3 0 02/03/2013 DEFUELED    
Farley 1 100        
Farley 2 0 04/14/2013 REFUELING OUTAGE - CORE RELOAD IN PROGRESS *  
Harris 1 100        
Hatch 1 100   MONITORING SAFETY RELIEF VALVES    
Hatch 2 100        
McGuire 1 78   SECONDARY CHEMISTRY HOLD *  
McGuire 2 100        
North Anna 1 100        
North Anna 2 0 04/06/2013 REFUELING OUTAGE    
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 29   HOLDING POWER FOR TESTING    
Vogtle 1 100   DIESEL GENERATOR "B" UNAVAILABLE DUE TO MAINTENANCE    
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 0 04/07/2013 REFUELING OUTAGE    
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 0 03/26/2013 REFUELING OUTAGE    
D.C. Cook 2 100   SYSTEM HIGH VOLTAGE ACTION *  
Davis-Besse 100        
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 65   MAIN FEEDPUMP REPAIRS IN PROGRESS    
Kewaunee 100        
La Salle 1 0 04/17/2013 CHECKING SEATING OF AN SRV    
La Salle 2 20   INCREASING POWER *  
Monticello 0 03/01/2013 REFUELING OUTAGE    
Palisades 100        
Perry 1 0 03/17/2013 REFUELING OUTAGE CORE RELOAD IN PROGRESS    
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 0 03/24/2013 REFUELING OUTAGE    
Arkansas Nuclear 2 0 03/31/2013 FORCED OUTAGE - SEE EVENT #48869    
Callaway 0 04/08/2013 REFUELING OUTAGE    
Columbia Generating Station 100        
Comanche Peak 1 100     *  
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 04/09/2011 DEFUELED    
Grand Gulf 1 100        
Palo Verde 1 0 03/30/2013 REFUELING OUTAGE *  
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 99   FIRST POINT HEATER MAINTENANCE - LIMITED BY STEAM FLOW    
San Onofre 2 0 01/09/2012 REFUELING OUTAGE    
San Onofre 3 0 01/31/2012 FORCED OUTAGE - S/G REPAIR    
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021