Power Reactor Status Report for March 28, 2013
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 94 | FUEL CONDITIONING HOLD | * | ||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | 13.8 KV LINE 33332LM OOS | |||
Indian Point 3 | 0 | 03/03/2013 | 13.8 KV LINE 33332LM OOS RAISING TEMPERATURE AND PRESSURE REFUELING OUTAGE | * | |
Limerick 1 | 100 | ||||
Limerick 2 | 0 | 03/24/2013 | REFUELING OUTAGE | ||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 94 | POWER LIMITED TO MONITOR AN SRV TAILPIPE TEMPERATURE 345 KV LINE MAINTENANCE REQUIRES A CONTINGENCY PLAN TO REDUCE LOAD IF NECESSARY | |||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | 345 KV LINE MAINTENANCE REQUIRES A CONTINGENCY PLAN TO REDUCE LOAD IF NECESSARY | |||
Susquehanna 1 | 99 | LIMITED BY GENERATOR CAPABILITY CURVE - VOLTAGE REGULATOR IN MANUAL - OUTPUT LIMITED TO 1340 MWE BY GRID OPERATOR | |||
Susquehanna 2 | 99 | LIMITED BY GENERATOR CAPABILITY CURVE - OUTPUT LIMITED TO 1340 MWE BY GRID OPERATOR | |||
Three Mile Island 1 | 100 | ||||
Vermont Yankee | 0 | 03/09/2013 | REFUELING OUTAGE |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 14 | PREPARING TO SYNC TO THE GRID | * | ||
Browns Ferry 2 | 0 | 03/14/2013 | REFUELING OUTAGE | ||
Browns Ferry 3 | 100 | ||||
Brunswick 1 | 100 | ||||
Brunswick 2 | 0 | 03/02/2013 | REFUELING OUTAGE | ||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 0 | 02/03/2013 | DEFUELED | ||
Farley 1 | 100 | ||||
Farley 2 | 81 | COASTDOWN TO REFUELING OUTAGE | * | ||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 0 | 03/16/2013 | REFUELING OUTAGE | * | |
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 0 | 03/12/2013 | FORCED OUTAGE | ||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | GRID STATUS YELLOW | |||
Sequoyah 2 | 100 | GRID STATUS YELLOW | |||
Summer | 0 | 03/23/2013 | PLANNED MAINTENANCE OUTAGE - REACTOR COOLANT PUMP SEAL FORCED OUTAGE | ||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 95 | REDUCED POWER DUE TO EXCESSIVE HIGH STEAM FLOW ALARMS | |||
Turkey Point 4 | 0 | 11/04/2012 | REFUELING OUTAGE TESTING | * | |
Vogtle 1 | 100 | ||||
Vogtle 2 | 0 | 03/10/2013 | CORE RELOAD COMPLETE | ||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 0 | 03/26/2013 | REFUELING OUTAGE | ||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | ||||
Dresden 2 | 100 | ||||
Dresden 3 | 100 | ||||
Duane Arnold | 100 | ||||
Fermi 2 | 66 | MAIN FEEDPUMP REPAIRS IN PROGRESS | * | ||
Kewaunee | 100 | ||||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 0 | 03/01/2013 | REFUELING OUTAGE | ||
Palisades | 100 | ||||
Perry 1 | 0 | 03/17/2013 | REFUELING OUTAGE | ||
Point Beach 1 | 0 | 03/17/2013 | REFUELING OUTAGE | ||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 0 | 03/10/2013 | REFUELING OUTAGE | ||
Quad Cities 2 | 100 |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 0 | 03/24/2013 | REFUELING OUTAGE | * | |
Arkansas Nuclear 2 | 100 | ||||
Callaway | 94 | COASTDOWN TO REFUELING OUTAGE | * | ||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | * | |||
Fort Calhoun | 0 | 04/09/2011 | REFUELING OUTAGE | ||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 100 | ||||
River Bend 1 | 100 | ||||
San Onofre 2 | 0 | 01/09/2012 | REFUELING OUTAGE | ||
San Onofre 3 | 0 | 01/31/2012 | FORCED OUTAGE - S/G REPAIR | ||
South Texas 1 | 100 | ||||
South Texas 2 | 0 | 01/08/2013 | FORCED OUTAGE | ||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 0 | 02/03/2013 | REFUELING OUTAGE - CORE RELOAD COMPLETE |
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021