Power Reactor Status Report for March 23, 2013
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 0 | 02/17/2013 | EXIT REFUELING OUTAGE | * | |
| FitzPatrick | 81 | INCREASING POWER | * | ||
| Ginna | 100 | ||||
| Hope Creek 1 | 100 | ||||
| Indian Point 2 | 100 | 13.8 KV LINE 33332LM OOS | |||
| Indian Point 3 | 0 | 03/03/2013 | 13.8 KV LINE 33332LM OOS REFUELING OUTAGE - CORE RELOAD COMPLETE | ||
| Limerick 1 | 100 | ||||
| Limerick 2 | 98 | COASTDOWN TO REFUELING OUTAGE | |||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 94 | POWER LIMITED TO MONITOR AN SRV TAILPIPE TEMPERATURE CONTINGENCY PLAN DUE TO OFFSITE LINE OUT OF SERVICE | * | ||
| Salem 1 | 100 | ||||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 99 | LIMITED BY GENERATOR CAPABILITY CURVE - VOLTAGE REGULATOR IN MANUAL - OUTPUT LIMITED TO 1340 MWE BY GRID OPERATOR | |||
| Susquehanna 2 | 99 | LIMITED BY GENERATOR CAPABILITY CURVE - OUTPUT LIMITED TO 1340 MWE BY GRID OPERATOR | |||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 0 | 03/09/2013 | REFUELING OUTAGE |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 0 | 03/19/2013 | MANUAL REACTOR SCRAM AFTER LOSS OF VACUUM - SEE EN #48829 | ||
| Browns Ferry 2 | 0 | 03/14/2013 | REFUELING OUTAGE | ||
| Browns Ferry 3 | 100 | ||||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 0 | 03/02/2013 | REFUELING OUTAGE | ||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 0 | 02/03/2013 | DEFUELED | ||
| Farley 1 | 100 | ||||
| Farley 2 | 86 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Harris 1 | 100 | ||||
| Hatch 1 | 100 | ||||
| Hatch 2 | 92 | HOLD FOR CONTROL ROD PATTERN ADJUSTMENT | * | ||
| McGuire 1 | 0 | 03/16/2013 | REFUELING OUTAGE | * | |
| McGuire 2 | 100 | ||||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 91 | PLANNED MAINTENANCE OUTAGE - MOISTURE SEPARATOR STEAM LEAK | * | ||
| Saint Lucie 1 | 0 | 03/12/2013 | FORCED OUTAGE | ||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 0 | 03/23/2013 | PLANNED MAINTENANCE OUTAGE - REACTOR COOLANT PUMP SEAL | * | |
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 96 | REDUCED POWER DUE TO EXCESSIVE HIGH STEAM FLOW ALARMS | * | ||
| Turkey Point 4 | 0 | 11/04/2012 | REFUELING OUTAGE | ||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 0 | 03/10/2013 | CORE RELOAD IN PROGRESS | * | |
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 60 | INCREASING POWER | * | ||
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 100 | ||||
| Dresden 2 | 100 | ||||
| Dresden 3 | 100 | ||||
| Duane Arnold | 100 | ||||
| Fermi 2 | 66 | MAIN FEEDPUMP REPAIRS IN PROGRESS | |||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 0 | 03/01/2013 | REFUELING OUTAGE | ||
| Palisades | 100 | ||||
| Perry 1 | 0 | 03/17/2013 | REFUELING OUTAGE | ||
| Point Beach 1 | 0 | 03/17/2013 | REFUELING OUTAGE | ||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 0 | 03/10/2013 | REFUELING OUTAGE | ||
| Quad Cities 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 79 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 96 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 15 | HOLDING POWER FOR GOVERNOR VALVE REPAIR | * | ||
| Fort Calhoun | 0 | 04/09/2011 | REFUELING OUTAGE | ||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 88 | INCREASING POWER | * | ||
| San Onofre 2 | 0 | 01/09/2012 | REFUELING OUTAGE | ||
| San Onofre 3 | 0 | 01/31/2012 | FORCED OUTAGE - S/G REPAIR | ||
| South Texas 1 | 100 | ||||
| South Texas 2 | 0 | 01/08/2013 | FORCED OUTAGE | ||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 0 | 02/03/2013 | REFUELING OUTAGE - CORE RELOAD COMPLETE | * |