Power Reactor Status Report for March 2, 2013

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 0 02/17/2013 DEFUELED    
FitzPatrick 100        
Ginna 100        
Hope Creek 1 75   TURBINE VALVE FREEDOM TEST *  
Indian Point 2 100   138 KV FEEDERS (LINES 33332LM/96951) OOS FOR PLANNED MAINTENANCE    
Indian Point 3 100   138 KV FEEDERS (LINES 33332LM/96951) OOS    
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 70   PLANT MAINTENANCE ON "C" RECIRC PUMP AND "B" MAIN FEEDWATER PUMP *  
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 94   REDUCED POWER TO MONITOR AN SRV TAILPIPE TEMPERATURE *  
Salem 1 100        
Salem 2 100        
Seabrook 1 100     *  
Susquehanna 1 99   LIMITED BY GENERATOR CAPABILITY CURVE    
Susquehanna 2 90   LIMITED BY GENERATOR CAPABILITY CURVE INCREASING POWER AFTER COMPLETION OF ROD PATTERN ADJUSTMENT *  
Three Mile Island 1 100        
Vermont Yankee 92   COASTDOWN TO REFUELING OUTAGE *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 88   COASTDOWN TO REFUELING OUTAGE    
Browns Ferry 3 100     *  
Brunswick 1 100        
Brunswick 2 93   COASTDOWN TO REFUELING OUTAGE    
Catawba 1 100        
Catawba 2 100        
Crystal River 3 0 02/03/2013 DEFUELED    
Farley 1 100        
Farley 2 99   CATION RESIN BED FLUSH *  
Harris 1 100        
Hatch 1 100     *  
Hatch 2 0 02/11/2013 REFUELING OUTAGE    
McGuire 1 90   COASTDOWN TO REFUELING OUTAGE    
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100     *  
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 0 02/17/2013 FORCED OUTAGE    
Turkey Point 4 0 11/04/2012 REFUELING OUTAGE    
Vogtle 1 100        
Vogtle 2 56   SLOWLY INCREASING POWER *  
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 97   LIMITED BY GENERATOR OUTPUT *  
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 66   MAIN FEEDPUMP REPAIRS IN PROGRESS    
Kewaunee 100        
La Salle 1 100        
La Salle 2 0 02/10/2013 REFUELING OUTAGE *  
Monticello 0 03/01/2013 REFUELING OUTAGE *  
Palisades 100        
Perry 1 93   COASTDOWN TO REFUELING OUTAGE *  
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 97   COASTDOWN TO REFUELING OUTAGE *  
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 70   ROD PATTERN ADJUSTMENT *  
Diablo Canyon 1 100        
Diablo Canyon 2 0 02/02/2013 REFUELING OUTAGE    
Fort Calhoun 0 04/09/2011 REFUELING OUTAGE    
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 0 02/16/2013 REFUELING OUTAGE    
San Onofre 2 0 01/09/2012 REFUELING OUTAGE    
San Onofre 3 0 01/31/2012 DEFUELED - FORCED OUTAGE - S/G REPAIR EDG 'A' OOS FOR MAINT *  
South Texas 1 100        
South Texas 2 0 01/08/2013 FORCED OUTAGE    
Waterford 3 100        
Wolf Creek 1 0 02/03/2013 REFUELING OUTAGE    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021