Power Reactor Status Report for November 20, 2011
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | HIGH SYSTEM VOLTAGE ALERT | * | ||
Calvert Cliffs 2 | 100 | HIGH SYSTEM VOLTAGE ALERT | * | ||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | ||||
Millstone 3 | 0 | 10/08/2011 | EXITING REFUELING OUTAGE | * | |
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 80 | DOWNPOWER FOR SCHEDULED PLANT TESTING | * | ||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 0 | 11/17/2011 | MAINTENANCE OUTAGE - TS SHUTDOWN LEAKING FEEDWATER CHECK VALVE SEE EN # 47454 | ||
Salem 1 | 1 | TURBINE TESTING | * | ||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | ||||
Susquehanna 1 | 98 | MAXIMUM ELECTRICAL GENERATION | * | ||
Susquehanna 2 | 100 | * | |||
Three Mile Island 1 | 0 | 10/24/2011 | REFUELING OUTAGE | ||
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | 161KV TRINITY LINE OOS FOR SCHEDULED MAINTENANCE | |||
Browns Ferry 2 | 100 | 161KV TRINITY LINE OOS FOR SCHEDULED MAINTENANCE | |||
Browns Ferry 3 | 100 | 161KV TRINITY LINE OOS FOR SCHEDULED MAINTENANCE | * | ||
Brunswick 1 | 100 | * | |||
Brunswick 2 | 0 | 11/15/2011 | MAINTENANCE OUTAGE - TENSION REACTOR VESSEL HEAD SEE EN #47444 AND EN #47452 | ||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 0 | 09/25/2009 | DEFUELED; CONTAINMENT TENSIONING ON HOLD | ||
Farley 1 | 100 | * | |||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 0 | 08/23/2011 | EXITING REFUELING OUTAGE | * | |
Oconee 1 | 76 | DOWNPOWER TO REPAIR MAIN FEEDPUMP | * | ||
Oconee 2 | 89 | INCREASING POWER | * | ||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 70 | COASTDOWN TO REFUELING OUTAGE. 1A1 CIRC WATER PUMP WILL REMAIN OOS UNTIL THE OUTAGE | |||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | RACOON MOUNTAIN RESERVOIR EXTRA PUMPING REQUIREMENT | * | ||
Sequoyah 2 | 100 | RACOON MOUNTAIN RESERVOIR EXTRA PUMPING REQUIREMENT | * | ||
Summer | 100 | ||||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 100 | ||||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 0 | 09/30/2011 | MAINTENANCE OUTAGE - REACTOR VESSEL HEAD REPLACEMENT | ||
Dresden 2 | 100 | ||||
Dresden 3 | 100 | ||||
Duane Arnold | 100 | ||||
Fermi 2 | 100 | * | |||
Kewaunee | 100 | ||||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 0 | 11/19/2011 | SCRAM. SEE EN# 47460. | * | 1 |
Palisades | 100 | ||||
Perry 1 | 100 | ||||
Point Beach 1 | 0 | 10/02/2011 | EXIT REFUELING OUTAGE | ||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 100 | ||||
Quad Cities 2 | 100 |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 0 | 10/16/2011 | EXITING REFUELING OUTAGE | ||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 0 | 10/15/2011 | EXITING REFUELING OUTAGE | ||
Columbia Generating Station | 53 | INCREASING POWER | * | ||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 0 | 04/09/2011 | EXITING REFUELING OUTAGE | ||
Grand Gulf 1 | 62 | ROD PATTERN ADJUSTMENTS; 2ND STAGE MSR LIMITED TO 96% POWER | * | ||
Palo Verde 1 | 0 | 10/07/2011 | EXITING REFUELING OUTAGE | ||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 100 | ||||
River Bend 1 | 100 | ||||
San Onofre 2 | 100 | ||||
San Onofre 3 | 100 | ||||
South Texas 1 | 100 | ||||
South Texas 2 | 0 | 10/29/2011 | EXIT REFUELING OUTAGE | * | |
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |