The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for November 15, 2011

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100   HIGH VOLTAGE ALERT *  
Calvert Cliffs 2 100   HIGH VOLTAGE ALERT *  
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 0 10/08/2011 REFUELING OUTAGE *  
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100   "B" EDG DECLARED INOPERABLE - UNIT IN 14-DAY LCO *  
Salem 1 0 10/23/2011 REFUELING OUTAGE    
Salem 2 92   PLANNED MAINTENANCE ON 500 KV LINE #5015 *  
Seabrook 1 100        
Susquehanna 1 100   HIGH SYSTEM VOLTAGE ACTION ALERT IN EFFECT    
Susquehanna 2 100   HIGH SYSTEM VOLTAGE ACTION ALERT IN EFFECT    
Three Mile Island 1 0 10/24/2011 REFUELING OUTAGE *  
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100   161KV TRINITY LINE OOS FOR SCHEDULED MAINTENANCE    
Browns Ferry 2 100   161KV TRINITY LINE OOS FOR SCHEDULED MAINTENANCE    
Browns Ferry 3 100   161KV TRINITY LINE OOS FOR SCHEDULED MAINTENANCE    
Brunswick 1 100        
Brunswick 2 1   STARTUP IN PROGRESS - RX SUBCRITICAL IN SOURCE RANGE *  
Catawba 1 100        
Catawba 2 100        
Crystal River 3 0 09/25/2009 DEFUELED; CONTAINMENT TENSIONING ON HOLD    
Farley 1 100        
Farley 2 88   INCREASING POWER *  
Harris 1 100        
Hatch 1 100     *  
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 8   INCREASING POWER *  
North Anna 2 0 08/23/2011 REFUELING OUTAGE *  
Oconee 1 100        
Oconee 2 0 10/21/2011 REFUELING OUTAGE    
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 75   COASTDOWN TO REFUELING OUTAGE. 1A1 CIRC WATER PUMP WILL REMAIN OOS UNTIL THE OUTAGE *  
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 99   POWER LIMITED BASED ON FEEDWATER INSTRUMENT FLOW UNCERTAINTY    
Byron 2 100     *  
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 0 09/30/2011 MAINTENANCE OUTAGE - REACTOR VESSEL HEAD REPLACEMENT    
Dresden 2 100        
Dresden 3 100        
Duane Arnold 96   INCREASING POWER TO 100% AFTER COMPLETION OF LOAD LINE ADJUSTMENT *  
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 0 10/02/2011 EXIT REFUELING OUTAGE    
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 0 10/16/2011 CORE RELOAD COMPLETE *  
Arkansas Nuclear 2 100        
Callaway 0 10/15/2011 REFUELING OUTAGE *  
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 04/09/2011 REFUELING OUTAGE    
Grand Gulf 1 71   INCREASING POWER TO 96% - 2ND STAGE MSR LIMITED TO 96% POWER *  
Palo Verde 1 0 10/07/2011 REFUELING OUTAGE *  
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 100        
San Onofre 3 100        
South Texas 1 100        
South Texas 2 0 10/29/2011 CORE RELOAD COMPLETE    
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021