Power Reactor Status Report for October 4, 2011
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | HIGH SYSTEM VOLTAGE ALERT | |||
Beaver Valley 2 | 100 | HIGH SYSTEM VOLTAGE ALERT | |||
Calvert Cliffs 1 | 68 | TS 3.0.3 REQUIRED S/D DUE TO BOTH "A" TRAIN EDGs INOPERABLE - EXITED A/S - SEE EN #47316 - INCREASING POWER TO 100% | * | ||
Calvert Cliffs 2 | 100 | TS 3.0.3 REQUIRED S/D DUE TO BOTH "A" TRAIN EDGs INOPERABLE - EXITED A/S - SEE EN #47316 | * | ||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | HIGH SYSTEM VOLTAGE ACTION | * | ||
Limerick 2 | 100 | HIGH SYSTEM VOLTAGE ACTION | * | ||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 0 | 09/11/2011 | REFUELING OUTAGE | ||
Pilgrim 1 | 100 | ||||
Salem 1 | 90 | HOLDING POWER DUE TO RIVER GRASSING | * | ||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | ||||
Susquehanna 1 | 100 | ||||
Susquehanna 2 | 100 | ||||
Three Mile Island 1 | 100 | HIGH SYSTEM VOLTAGE WARNING | * | ||
Vermont Yankee | 91 | COASTDOWN TO REFUELING OUTAGE | * |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | ||||
Browns Ferry 2 | 100 | ||||
Browns Ferry 3 | 93 | INCREASING POWER TO 100% | * | ||
Brunswick 1 | 100 | ||||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 0 | 09/25/2009 | DEFUELED; CONTAINMENT TENSIONING ON HOLD | ||
Farley 1 | 100 | ||||
Farley 2 | 94 | COASTDOWN TO REFUELING OUTAGE | * | ||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 88 | REDUCED POWER DUE TO FW HEATER ISOLATION - POWER LIMIT DUE TO SRV LEAKAGE | * | ||
McGuire 1 | 0 | 09/17/2011 | REFUELING OUTAGE - CORE RELOAD COMPLETED | * | |
McGuire 2 | 100 | ||||
North Anna 1 | 0 | 08/23/2011 | FORCED OUTAGE - HIGH SYSTEM VOLTAGE ACTION | * | |
North Anna 2 | 0 | 08/23/2011 | DEFUELED - HIGH SYSTEM VOLTAGE ACTION | * | |
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 89 | PLANNED MAINT TO LOCATE WATERBOX TUBE LEAK | |||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | GRID STATUS YELLOW - 161KV WATTS BAR LINE OOS | * | ||
Sequoyah 2 | 100 | GRID STATUS YELLOW - 161KV WATTS BAR LINE OOS | * | ||
Summer | 100 | ||||
Surry 1 | 100 | HIGH VOLTAGE SYSTEM ACTION | * | ||
Surry 2 | 100 | HIGH VOLTAGE SYSTEM ACTION | * | ||
Turkey Point 3 | 0 | 10/03/2011 | MAINTENANCE OUTAGE - RCS COOLDOWN IN PROGRESS - SHUTDOWN TO REPLACE "3C" RCP SEAL | * | |
Turkey Point 4 | 100 | ||||
Vogtle 1 | 100 | ||||
Vogtle 2 | 0 | 09/18/2011 | REFUELING OUTAGE - CORE RELOAD COMPLETE | ||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 0 | 09/18/2011 | REFUELING OUTAGE - CORE RELOAD COMPLETED - RV HEAD SET | * | |
Clinton | 97 | 100% ELECTRICAL CAPABILITY | * | ||
D.C. Cook 1 | 0 | 09/21/2011 | DEFUELED HIGH VOLTAGE ALERT | * | |
D.C. Cook 2 | 100 | HIGH VOLTAGE ALERT | * | ||
Davis-Besse | 0 | 09/30/2011 | MAINTENANCE OUTAGE | ||
Dresden 2 | 100 | APPROACHING END OF FUEL CYCLE | |||
Dresden 3 | 100 | ||||
Duane Arnold | 100 | ||||
Fermi 2 | 100 | * | |||
Kewaunee | 100 | * | |||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 96 | SCRAM TIME TESTING | * | ||
Palisades | 100 | * | |||
Perry 1 | 0 | 10/02/2011 | FORCED OUTAGE - TECH SPEC REQUIRED SHUTDOWN - SEE EN #47312 | * | |
Point Beach 1 | 0 | 10/02/2011 | REFUELING OUTAGE | * | |
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 100 | ||||
Quad Cities 2 | 100 |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 91 | COASTDOWN TO REFUELING OUTAGE | |||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 98 | INCREASING POWER; ROD PATTERN ADJUSTMENT | * | ||
Comanche Peak 1 | 0 | 10/01/2011 | REFUELING OUTAGE | * | |
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 0 | 04/09/2011 | REFUELING OUTAGE | ||
Grand Gulf 1 | 92 | 2ND STAGE MSR LIMITED TO 96% POWER - ROD PATTERN ADJUSTMENT | * | ||
Palo Verde 1 | 80 | HOLDING POWER FOR CHEMISTRY | |||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 100 | ||||
River Bend 1 | 100 | ||||
San Onofre 2 | 100 | SWITCHYARD RESTRICTION DUE TO EDG OUTAGE ON UNIT 3 | |||
San Onofre 3 | 100 | SWITCHYARD RESTRICTION DUE TO EDG OUTAGE ON UNIT 3 | |||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |