Power Reactor Status Report for September 18, 2011
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | MINIMUM GENERATION ALERT | * | ||
Beaver Valley 2 | 100 | MINIMUM GENERATION ALERT | * | ||
Calvert Cliffs 1 | 100 | HIGH SYSTEM VOLTAGE WARNING. MINIMUM GENERATION ALERT. | |||
Calvert Cliffs 2 | 100 | HIGH SYSTEM VOLTAGE WARNING. MINIMUM GENERATION ALERT. | |||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | * | |||
Limerick 2 | 100 | * | |||
Millstone 2 | 23 | INCREASING POWER | * | ||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 0 | 09/11/2011 | REFUELING OUTAGE | ||
Pilgrim 1 | 100 | ||||
Salem 1 | 75 | REDUCED POWER FOR WATERBOX CLEANING HIGH SYSTEM VOLTAGE WARNING AND MINIMUM GENERATION ALERT | * | ||
Salem 2 | 100 | HIGH SYSTEM VOLTAGE WARNING AND MINIMUM GENERATION ALERT | * | ||
Seabrook 1 | 100 | NEWINGTON OFFSITE POWER LINE OUT OF SERVICE | * | ||
Susquehanna 1 | 100 | HIGH SYSTEM VOLTAGE WARNING AND MINIMUM GENERATION ALERT | * | ||
Susquehanna 2 | 100 | HIGH SYSTEM VOLTAGE WARNING AND MINIMUM GENERATION ALERT | * | ||
Three Mile Island 1 | 100 | HIGH SYSTEM VOLTAGE WARNING | * | ||
Vermont Yankee | 97 | COASTDOWN TO REFUELING OUTAGE |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | ||||
Browns Ferry 2 | 100 | ||||
Browns Ferry 3 | 100 | ||||
Brunswick 1 | 100 | ||||
Brunswick 2 | 94 | REDUCED POWER FOR SURVEILLANCE TESTING | * | ||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 0 | 09/25/2009 | DEFUELED; CONTAINMENT TENSIONING ON HOLD | ||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 94 | INCREASING POWER | * | ||
Hatch 2 | 91 | HOLDING DUE TO SRV LEAKAGE | |||
McGuire 1 | 0 | 09/17/2011 | REFUELING OUTAGE | * | |
McGuire 2 | 100 | ||||
North Anna 1 | 0 | 08/23/2011 | SEE EN# 47201 GRID HIGH VOLTAGE WARNING | ||
North Anna 2 | 0 | 08/23/2011 | SEE EN# 47201 GRID HIGH VOLTAGE WARNING | ||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 100 | ||||
Vogtle 2 | 23 | SHUTTING DOWN FOR A REFUELING OUTAGE | * | ||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 97 | 100% ELECTRICAL CAPABILITY MINIMUM GENERATION WARNING AND ALERT | * | ||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 100 | * | |||
Davis-Besse | 100 | ||||
Dresden 2 | 100 | ||||
Dresden 3 | 100 | ||||
Duane Arnold | 100 | ||||
Fermi 2 | 100 | ||||
Kewaunee | 100 | MINIMUM GENERATION ALERT | * | ||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 100 | ||||
Palisades | 0 | 09/16/2011 | REACTOR UE AND MANUAL TRIP DUE TO RCS LEAK GREATER THAN 10 GPM - SEE EN #47271 | ||
Perry 1 | 100 | LOW LOAD ALERT | * | ||
Point Beach 1 | 100 | ||||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 100 | ||||
Quad Cities 2 | 100 |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 0 | 04/02/2011 | REFUELING OUTAGE | ||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 0 | 04/09/2011 | REFUELING OUTAGE | ||
Grand Gulf 1 | 96 | 2ND STAGE MSR LIMITED TO 96% POWER | |||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 100 | ||||
River Bend 1 | 100 | ||||
San Onofre 2 | 100 | ||||
San Onofre 3 | 100 | ||||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021