Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Power Reactor Status Report for June 30, 2011

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100     *  
Ginna 100     *  
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 0 06/26/2011 RX TRIP DUE TO LOSS OF RCP. SEE EN# 46992.    
Seabrook 1 100        
Susquehanna 1 86   INCREASING POWER TO 95% AND HOLDING FOR ADDITIONAL TESTING *  
Susquehanna 2 15   HOLDING POWER FOR TURBINE TESTING *  
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 0 09/25/2009 DEFUELED CONTAINMENT TENSIONING ON HOLD    
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 99   HEAT INDEX (HIGH CONDENSATE TEMPERATURE)    
Hatch 2 99   HEAT INDEX (HIGH CONDENSATE TEMPERATURE)    
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 98   HOLDING POWER    
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100     *  
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 95   HOLDING FOR TESTS *  
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 0 04/02/2011 REFUELING OUTAGE    
Comanche Peak 1 100   HANDS-OFF IN EFFECT *  
Comanche Peak 2 100   HANDS-OFF IN EFFECT *  
Cooper 100   NOUE DUE TO MISSOURI RIVER WATER LEVEL - SEE EN #46969    
Diablo Canyon 1 100     *  
Diablo Canyon 2 100     *  
Fort Calhoun 0 04/09/2011 REFUELING OUTAGE - NOUE DUE TO MISSOURI RIVER WATER LEVEL - SEE EN #46929    
Grand Gulf 1 96   2ND STAGE MSR LIMITED *  
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 100        
San Onofre 3 100        
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 12   GENERATOR ONLINE - INCREASING POWER TO 20% FOR ADDITIONAL STARTUP TESTS *  