Power Reactor Status Report for April 20, 2011
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 82 | WATER BOX CLEANING | |||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | MAIN GENERATOR VOLTAGE REGULATOR IN MANUAL | |||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | ||||
Limerick 2 | 0 | 03/27/2011 | REFUELING OUTAGE | ||
Millstone 2 | 0 | 04/02/2011 | REFUELING OUTAGE - CORE RELOAD COMPLETED | * | |
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 34 | NOT SYNCED TO THE GRID FOR TURBINE OVERSPEED TEST | * | ||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 0 | 04/17/2011 | REFUELING OUTAGE | ||
Salem 1 | 100 | HIGH VOLTAGE LIGHT LOAD ALERT | * | ||
Salem 2 | 0 | 04/09/2011 | DEFUELED - HIGH VOLTAGE LIGHT LOAD ALERT | * | |
Seabrook 1 | 0 | 03/31/2011 | REFUELING OUTAGE - CORE RELOAD COMPLETED | ||
Susquehanna 1 | 99 | 100% ELECTRICAL CAPABILITY | * | ||
Susquehanna 2 | 0 | 04/04/2011 | REFUELING OUTAGE | * | |
Three Mile Island 1 | 100 | * | |||
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | ||||
Browns Ferry 2 | 100 | ||||
Browns Ferry 3 | 100 | ||||
Brunswick 1 | 100 | ||||
Brunswick 2 | 0 | 04/18/2011 | MAINTENANCE OUTAGE - DRYWELL LEAK REPAIR | ||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 0 | 09/25/2009 | MAINTENANCE OUTAGE - CONTAINMENT TENSIONING ON HOLD | ||
Farley 1 | 100 | 500 KV OFFSITE LINE OOS FOR PLANNED MAINTENANCE UNTIL 5/6 | |||
Farley 2 | 100 | 500 KV OFFSITE LINE OOS FOR PLANNED MAINTENANCE UNTIL 5/6 | |||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 0 | 03/28/2011 | REFUELING OUTAGE | ||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 0 | 04/01/2011 | DEFUELED | ||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 0 | 01/02/2011 | REFUELING OUTAGE - MAKING PREPARATIONS TO ENTER MODE 6 FOR REMOVAL OF RV HEAD TO CONNECT CRD COUPLING | ||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 97 | COASTDOWN TO REFUELING OUTAGE | * | ||
Summer | 0 | 04/15/2011 | REFUELING OUTAGE | ||
Surry 1 | 0 | 04/16/2011 | FORCED OUTAGE - UE DECLARED DUE TO A LOSS OF OFFSITE POWER - SEE EN #46761 | ||
Surry 2 | 0 | 04/16/2011 | FORCED OUTAGE - UE DECLARED DUE TO A LOSS OF OFFSITE POWER - SEE EN #46761 | ||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 0 | 03/20/2011 | REFUELING OUTAGE | ||
Vogtle 1 | 100 | ||||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 0 | 04/03/2011 | DEFUELED |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 0 | 04/17/2011 | REFUELING OUTAGE | * | |
Byron 1 | 0 | 03/13/2011 | REFUELING OUTAGE - FUEL RELOAD COMPLETED | ||
Byron 2 | 100 | ||||
Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | ||||
Dresden 2 | 100 | ||||
Dresden 3 | 100 | ||||
Duane Arnold | 100 | ||||
Fermi 2 | 100 | ||||
Kewaunee | 100 | ||||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 0 | 03/04/2011 | REFUELING OUTAGE | ||
Palisades | 100 | ||||
Perry 1 | 0 | 04/17/2011 | REFUELING OUTAGE | ||
Point Beach 1 | 100 | ||||
Point Beach 2 | 0 | 02/28/2011 | REFUELING OUTAGE | ||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 100 | ||||
Quad Cities 2 | 100 |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 0 | 04/02/2011 | REFUELING OUTAGE | ||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 0 | 04/03/2011 | CORE RELOAD COMPLETED | ||
Cooper | 0 | 03/12/2011 | REFUELING OUTAGE | ||
Diablo Canyon 1 | 85 | REDUCED POWER FOR FW HEATER STEAM LEAK REPAIR | * | ||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 0 | 04/09/2011 | REFUELING OUTAGE | ||
Grand Gulf 1 | 96 | POWER LIMITED 2ND STAGE MSR OUT OF SERVICE FOR THE ENTIRE CYCLE | |||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 0 | 04/01/2011 | DEFUELED | ||
Palo Verde 3 | 100 | ||||
River Bend 1 | 100 | ||||
San Onofre 2 | 100 | ||||
San Onofre 3 | 100 | ||||
South Texas 1 | 0 | 04/02/2011 | DEFUELED | ||
South Texas 2 | 100 | ||||
Waterford 3 | 0 | 04/05/2011 | DEFUELED | ||
Wolf Creek 1 | 0 | 03/18/2011 | DEFUELED |