The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for February 14, 2011

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100   WIND ADVISORY FROM 0600 TO 2000 TODAY *  
Beaver Valley 2 100   WIND ADVISORY FROM 0600 TO 2000 TODAY *  
Calvert Cliffs 1 100        
Calvert Cliffs 2 0 02/13/2011 REFUELING OUTAGE *  
FitzPatrick 100   MAIN GENERATOR IN MANUAL VOLTAGE REGULATION *  
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 99   COASTDOWN TO REFUELING OUTAGE *  
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 99   100% ELECTRICAL CAPABILITY    
Susquehanna 2 94   100% ELECTRICAL CAPABILITY    
Three Mile Island 1 100        
Vermont Yankee 100   DOWNPOWER TO 60% FOR ROD SEQUENCE EXCHANGE AT 0900 TODAY *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 99   COASTDOWN TO REFUELING OUTAGE *  
Catawba 1 100        
Catawba 2 100        
Crystal River 3 0 09/25/2009 MAINTENANCE OUTAGE - CONTAINMENT TENSIONING IN PROGRESS    
Farley 1 100        
Farley 2 0 02/12/2011 MAINTENANCE OUTAGE    
Harris 1 100        
Hatch 1 100        
Hatch 2 100     *  
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 0 01/02/2011 DEFUELED    
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 0 02/02/2011 MAINTENANCE OUTAGE    
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100   COASTDOWN TO REFUELING OUTAGE *  
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 1   STARTUP IN PROGRESS - RX CRITICAL INTERMEDIATE RANGE - HEATING UP *  
Kewaunee 100        
La Salle 1 100        
La Salle 2 1   SHUTTING DOWN FOR REFUELING OUTAGE - RX POWER LESS THAN 1% *  
Monticello 100     *  
Palisades 100        
Perry 1 99   COASTDOWN TO REFUELING OUTAGE    
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100     *  
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100   230KV MORRO BAY - DIABLO CANYON LINE OOS (1 SHIFT) FOR PLANNED MAINTENANCE STARTING 0800 PST ON TUES, 2/15 *  
Diablo Canyon 2 100   230KV MORRO BAY - DIABLO CANYON LINE OOS (1 SHIFT) FOR PLANNED MAINTENANCE STARTING 0800 PST ON TUES, 2/15 *  
Fort Calhoun 100        
Grand Gulf 1 96   POWER LIMITED 2ND STAGE MSR OUT OF SERVICE FOR THE ENTIRE CYCLE    
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 58   HOLDING POWER TO PERFORM TIPS TO RESOLVE PLANT COMPUTER PROBLEM *  
San Onofre 2 100   SWITCHYARD RESTRICTION DUE TO UNIT 2 "B" EDG INOPERABLE    
San Onofre 3 0 10/09/2010 EXITING REFUELING OUTAGE - SWITCHYARD RESTRICTION DUE TO UNIT 2 "B" EDG INOPERABLE    
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021