Power Reactor Status Report for November 16, 2010
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
Beaver Valley 1 | 100 | | | | |
Beaver Valley 2 | 100 | | | | |
Calvert Cliffs 1 | 100 | | 500KV BLACK BUS OUTAGE FOR SCHEDULED MAINTENANCE | | |
Calvert Cliffs 2 | 100 | | 500KV BLACK BUS OUTAGE FOR SCHEDULED MAINTENANCE | | |
FitzPatrick | 42 | | REDUCING POWER TO 13% FOR "B" RECIRC PUMP SCOOP REPAIR AND DRYWELL INSTRUMENT HEADER N2 LEAK REPAIR | * | |
Ginna | 100 | | | | |
Hope Creek 1 | 100 | | | * | |
Indian Point 2 | 0 | 11/07/2010 | FORCED OUTAGE | | |
Indian Point 3 | 100 | | | | |
Limerick 1 | 100 | | | | |
Limerick 2 | 100 | | | | |
Millstone 2 | 100 | | | | |
Millstone 3 | 100 | | | | |
Nine Mile Point 1 | 100 | | | * | |
Nine Mile Point 2 | 100 | | | | |
Oyster Creek | 0 | 10/31/2010 | REFUELING OUTAGE | * | |
Peach Bottom 2 | 100 | | ONE OF THREE STARTUP LINES OOS FOR TRANSFORMER MAINTENANCE | | |
Peach Bottom 3 | 0 | 11/15/2010 | MAINTENANCE OUTAGE FOR REPAIR OF "3B" MAIN TRANSFORMER - ONE OF THREE STARTUP LINES OOS FOR TRANSFORMER MAINTENANCE | * | |
Pilgrim 1 | 100 | | | | |
Salem 1 | 100 | | | | |
Salem 2 | 100 | | | | |
Seabrook 1 | 100 | | | | |
Susquehanna 1 | 100 | | | | |
Susquehanna 2 | 94 | | 100% ELECTRICAL CAPABILITY | | |
Three Mile Island 1 | 100 | | | | |
Vermont Yankee | 100 | | | | |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
Browns Ferry 1 | 0 | 11/06/2010 | REFUELING OUTAGE | | |
Browns Ferry 2 | 100 | | | | |
Browns Ferry 3 | 100 | | | | |
Brunswick 1 | 100 | | | | |
Brunswick 2 | 100 | | | | |
Catawba 1 | 100 | | | | |
Catawba 2 | 100 | | | | |
Crystal River 3 | 0 | 09/25/2009 | DEFUELED | | |
Farley 1 | 0 | 10/10/2010 | REFUELING OUTAGE | | |
Farley 2 | 100 | | | | |
Harris 1 | 72 | | NORMAL POWER INCREASE | * | |
Hatch 1 | 100 | | | | |
Hatch 2 | 100 | | | | |
McGuire 1 | 100 | | | | |
McGuire 2 | 100 | | | | |
North Anna 1 | 100 | | | | |
North Anna 2 | 100 | | | * | |
Oconee 1 | 19 | | TURBINE GENERATOR OFFLINE FOR MAIN XFMR OIL LEAK REPAIR. REPAIR COMPLETE. RESTORATION IS IN PROGRESS | * | |
Oconee 2 | 100 | | | | |
Oconee 3 | 0 | 10/22/2010 | REFUELING OUTAGE | | |
Robinson 2 | 0 | 10/06/2010 | MAINTENANCE OUTAGE | | |
Saint Lucie 1 | 100 | | | | |
Saint Lucie 2 | 100 | | | | |
Sequoyah 1 | 4 | | STARTUP IN PROGRESS | * | |
Sequoyah 2 | 100 | | | | |
Summer | 100 | | | | |
Surry 1 | 0 | 10/23/2010 | DEFUELED | | |
Surry 2 | 98 | | 100% ELECTRICAL CAPABILITY | | |
Turkey Point 3 | 0 | 11/15/2010 | MANUAL REACTOR TRIP. SEE EN# 46419. | * | 1 |
Turkey Point 4 | 100 | | | | |
Vogtle 1 | 100 | | | | |
Vogtle 2 | 100 | | | | |
Watts Bar 1 | 0 | 11/14/2010 | FORCED OUTAGE - MANUAL RX TRIP DUE TO LOSS OF COOLING TO "A" PHASE MAIN BANK XFMR - SEE EN #46418 - WILL PERFORM OTHER MAINTENANCE WORK DURING OUTAGE | | |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
Braidwood 1 | 100 | | | | |
Braidwood 2 | 100 | | | | |
Byron 1 | 100 | | | | |
Byron 2 | 100 | | | | |
Clinton | 97 | | 100% ELECTRICAL CAPABILITY | | |
D.C. Cook 1 | 100 | | | | |
D.C. Cook 2 | 0 | 10/05/2010 | DEFUELED | | |
Davis-Besse | 100 | | | | |
Dresden 2 | 100 | | | | |
Dresden 3 | 0 | 10/31/2010 | REFUELING OUTAGE | | |
Duane Arnold | 0 | 10/23/2010 | REFUELING OUTAGE | | |
Fermi 2 | 0 | 10/24/2010 | REFUELING OUTAGE | | |
Kewaunee | 100 | | | | |
La Salle 1 | 100 | | | | |
La Salle 2 | 100 | | | | |
Monticello | 11 | | HOLDING POWER FOR REPAIRS - GENERATOR OFFLINE | | |
Palisades | 100 | | | | |
Perry 1 | 100 | | | | |
Point Beach 1 | 100 | | | | |
Point Beach 2 | 100 | | | | |
Prairie Island 1 | 100 | | | * | |
Prairie Island 2 | 100 | | | | |
Quad Cities 1 | 100 | | | | |
Quad Cities 2 | 100 | | | | |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
Arkansas Nuclear 1 | 100 | | | | |
Arkansas Nuclear 2 | 100 | | | | |
Callaway | 100 | | | | |
Columbia Generating Station | 100 | | | | |
Comanche Peak 1 | 100 | | | | |
Comanche Peak 2 | 100 | | | | |
Cooper | 100 | | | | |
Diablo Canyon 1 | 78 | | INCREASING POWER TO 93% FOR TESTING. DIABLO MIDWAY #2 500KV LINE OOS FOR MAINTENANCE UNTIL 11/17/10. | * | |
Diablo Canyon 2 | 100 | | DIABLO MIDWAY #2 500KV LINE OOS FOR MAINTENANCE UNTIL 11/17/10. | | |
Fort Calhoun | 100 | | | | |
Grand Gulf 1 | 100 | | | | |
Palo Verde 1 | 100 | | | | |
Palo Verde 2 | 100 | | | | |
Palo Verde 3 | 100 | | | | |
River Bend 1 | 100 | | DIV II EDG OUTAGE | * | |
San Onofre 2 | 100 | | SWITCHYARD RESTRICTIONS - NO MAINTENANCE WITHOUT SHIFT MANAGER APPROVAL | | |
San Onofre 3 | 0 | 10/09/2010 | DEFUELED - SWITCHYARD RESTRICTIONS - NO MAINTENANCE WITHOUT SHIFT MANAGER APPROVAL | | |
South Texas 1 | 100 | | | | |
South Texas 2 | 0 | 11/03/2010 | MAINTENANCE OUTAGE | | |
Waterford 3 | 100 | | | | |
Wolf Creek 1 | 100 | | | | |
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:
- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
Page Last Reviewed/Updated Thursday, March 25, 2021