The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for June 11, 2010

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 96   CONDENSER WATERBOX CLEANING *  
Calvert Cliffs 2 100        
FitzPatrick 93   INCREASING POWER FOLLOWING ROD PATTERN ADJUSTMENT *  
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100   33332LM (138 KV) TIE LINE FEEDER OOS    
Indian Point 3 100   33332LM (138 KV) TIE LINE FEEDER OOS    
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 100        
Susquehanna 2 94   100% ELECTRICAL CAPABILITY    
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 0 06/09/2010 BEGIN STARTUP-POINT OF ADDING HEAT *  
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 0 09/25/2009 DEFUELED    
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 90   HOLD FOR ROD PATTERN ADJUSTMENT *  
Hatch 2 100        
McGuire 1 44   CONTROL ROD DROP *  
McGuire 2 100        
North Anna 1 98   INCREASING POWER *  
North Anna 2 99     *  
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 0 03/28/2010 CORE RELOAD IN PROGRESS *  
Saint Lucie 1 0 04/04/2010 HOLDING    
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 0 06/08/2010 REACTOR TRIP; SEE EN #45986    
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 0 02/27/2010 REFUELING OUTAGE    
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 0 06/05/2010 REACTOR SHUTDOWN WHILE MAKING REPAIRS AT THE SITE    
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 0 04/17/2010 REFUELING OUTAGE *  
Columbia Generating Station 40   CONDENSER TUBE LEAK REPAIR ONGOING AS WELL AS ECONOMIC DISPATCH    
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100     *  
Diablo Canyon 1 100     *  
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 100        
San Onofre 3 100        
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021