The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for March 31, 2010

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 0 03/10/2010 REFUELING OUTAGE - CORE RELOAD COMPLETED    
Indian Point 3 100   REDUNDANT 138KV FEEDER #95891 OOS FOR MAINTENANCE    
Limerick 1 0 03/21/2010 REFUELING OUTAGE    
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 99   COASTDOWN TO REFUELING OUTAGE    
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100   48-HR ACTION STATEMENT FOR 'B' EDG INOP DUE TO PM *  
Salem 1 100        
Salem 2 100        
Seabrook 1 100   LOAD MAINTAINED GREATER THAN 357 KVARS DUE TO LINE #394 OOS UNTIL MID-MAY    
Susquehanna 1 0 03/01/2010 REFUELING OUTAGE    
Susquehanna 2 94   100% ELECTRICAL CAPABILITY    
Three Mile Island 1 100        
Vermont Yankee 98   COASTDOWN TO REFUELING OUTAGE *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100     *  
Browns Ferry 2 100     *  
Browns Ferry 3 0 02/27/2010 REFUELING OUTAGE *  
Brunswick 1 0 02/26/2010 REFUELING OUTAGE    
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 0 09/25/2009 DEFUELED    
Farley 1 100        
Farley 2 94   COASTDOWN TO REFUELING OUTAGE *  
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 0 03/13/2010 REFUELING OUTAGE - CORE RELOAD IN PROGRESS *  
McGuire 2 100        
North Anna 1 100        
North Anna 2 0 03/20/2010 DEFUELED    
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 0 03/28/2010 FORCED OUTAGE *  
Saint Lucie 1 74   COASTDOWN TO REFUELING OUTAGE *  
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 58   REDUCED POWER AFTER REMOVING FROM SERVICE "2A" MAIN FEEDWATER PUMP FOR REPAIRS *  
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 0 03/07/2010 REFUELING OUTAGE *  
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 0 03/02/2010 REFUELING OUTAGE - RV HEAD SET BUT NOT TENSIONED *  
D.C. Cook 2 100        
Davis-Besse 0 02/27/2010 DEFUELED    
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 37   INCREASING POWER TO 100% *  
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 85   "B" RFP REPAIRS COMPLETED - RESTORATION IN PROGRESS *  
Point Beach 1 0 02/28/2010 REFUELING OUTAGE - 345KV LINE "121" OOS FOR MAINTENANCE    
Point Beach 2 100   345KV LINE "121" OOS FOR MAINTENANCE    
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 0 03/14/2010 REFUELING OUTAGE    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 0 03/21/2010 REFUELING OUTAGE - CORE OFFLOAD IN PROGRESS    
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 40   REDUCED POWER FOR FEEDWATER HEATER REPAIR *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 96   COASTDOWN TO REFUELING OUTAGE *  
Palo Verde 1 97   HOLDING POWER DUE TO TURBINE FIRST STAGE PRESSURE CONCERN    
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 0 09/26/2009 EXITING REFUELING / MAINTENANCE OUTAGE    
San Onofre 3 50   REDUCED POWER FOR FUEL MANAGEMENT    
South Texas 1 100        
South Texas 2 0 03/27/2010 REFUELING OUTAGE    
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.