The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for November 6, 2009

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 0 10/11/2009 DEFUELED    
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 52   HOLDING POWER TO TROUBLESHOOT GENERATOR EXCITATION *  
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100     *  
Millstone 2 0 10/06/2009 REFUELING OUTAGE    
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 0 10/13/2009 REFUELING OUTAGE *  
Seabrook 1 0 09/30/2009 REFUELING OUTAGE *  
Susquehanna 1 94   100% ELECTRICAL CAPABILITY    
Susquehanna 2 94   100% ELECTRICAL CAPABILITY    
Three Mile Island 1 0 10/25/2009 DEFUELED *  
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 100     *  
Catawba 1 96   COASTDOWN TO REFUELING OUTAGE    
Catawba 2 100        
Crystal River 3 0 09/25/2009 DEFUELED    
Farley 1 100   500KV RACCOON CREEK LINE OOS *  
Farley 2 0 11/05/2009 FORCED OUTAGE - SHUTDOWN TO REPAIR OIL LEAK ON PHASE 2 MAIN TRANSFORMER - 500KV RACCOON CREEK LINE OOS *  
Harris 1 100        
Hatch 1 100        
Hatch 2 62   REDUCED POWER TO PERFORM FLUX TILT TESTING TO IDENTIFY CONTROL ROD LEAK *  
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 0 10/09/2009 REFUELING OUTAGE *  
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 0 10/25/2009 DEFUELED    
Summer 0 10/16/2009 DEFUELED    
Surry 1 100        
Surry 2 0 10/31/2009 REFUELING OUTAGE - RV HEAD DETENSIONED AND SCHEDULED FOR LIFT AT 1000 HRS ON 11/06. *  
Turkey Point 3 100        
Turkey Point 4 0 10/25/2009 DEFUELED    
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100     *  
Byron 1 100        
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 0 09/20/2008 FORCED OUTAGE - CORRECTED OUTAGE DATE *  
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 0 11/01/2009 REFUELING OUTAGE - CORE SHUFFLE IN PROGRESS    
Dresden 3 98   100% ELECTRICAL CAPABILITY    
Duane Arnold 100   SWITCHYARD WORK CONTINUING TODAY *  
Fermi 2 0 09/30/2009 FORCED OUTAGE    
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 97   DECREASING POWER FOR ROD ADJUSTMENTS *  
Point Beach 1 100        
Point Beach 2 0 10/14/2009 REFUELING OUTAGE *  
Prairie Island 1 0 09/11/2009 EXITING REFUELING OUTAGE - EVALUATING RCP SEAL LEAKAGE *  
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100     *  
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 13   HEATING UP - ROLLING TURBINE *  
Diablo Canyon 1 100        
Diablo Canyon 2 0 10/03/2009 REFUELING OUTAGE    
Fort Calhoun 0 10/31/2009 REFUELING OUTAGE    
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 0 10/02/2009 DEFUELED    
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 0 09/26/2009 DEFUELED    
San Onofre 3 100        
South Texas 1 0 09/30/2009 REFUELING OUTAGE    
South Texas 2 100        
Waterford 3 0 10/19/2009 DEFUELED *  
Wolf Creek 1 0 10/09/2009 REFUELING OUTAGE *  

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.