The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for October 5, 2009

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100     *  
Calvert Cliffs 2 99   100% ELECTRICAL CAPABILITY *  
FitzPatrick 100        
Ginna 74   INCREASING POWER TO 81% FOR FLUX MAPPING *  
Hope Creek 1 100   500KV LINE 5022 OOS - MINIMUM MVAR LIMIT IN EFFECT    
Indian Point 2 100   138KV LINE 33332 L&M OOS    
Indian Point 3 100   138KV LINE 33332 L&M OOS    
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100     *  
Peach Bottom 2 100        
Peach Bottom 3 0 09/13/2009 REFUELING OUTAGE    
Pilgrim 1 100     *  
Salem 1 100        
Salem 2 100        
Seabrook 1 0 09/30/2009 REFUELING OUTAGE    
Susquehanna 1 94   100% ELECTRICAL CAPABILITY *  
Susquehanna 2 94   100% ELECTRICAL CAPABILITY *  
Three Mile Island 1 100     *  
Vermont Yankee 100     *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100     *  
Browns Ferry 2 37   INCREASING POWER *  
Browns Ferry 3 100     *  
Brunswick 1 100     *  
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 0 09/25/2009 REFUELING OUTAGE    
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 57   DOWNPOWER TO TROUBLESHOOT "B" FEEDPUMP WHICH IS OOS *  
Hatch 2 100        
McGuire 1 100        
McGuire 2 0 09/05/2009 REFUELING OUTAGE    
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 0 10/02/2009 FORCED OUTAGE    
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 0 09/20/2009 REFUELING OUTAGE - DEFUELED    
Vogtle 2 100        
Watts Bar 1 0 09/20/2009 REFUELING OUTAGE - DEFUELED    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 0 09/13/2009 REFUELING OUTAGE    
Byron 2 100        
Clinton 95   HOLDING POWER FOR XENON *  
D.C. Cook 1 0 03/02/2009 FORCED OUTAGE    
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 98   100% ELECTRICAL CAPABILITY    
Dresden 3 0 10/03/2009 AUTO SCRAM FOLLOWING MSIV CLOSURE SEE EN# 45409    
Duane Arnold 100        
Fermi 2 0 09/30/2009 FORCED OUTAGE    
Kewaunee 0 09/25/2009 REFUELING OUTAGE    
La Salle 1 100        
La Salle 2 100        
Monticello 100     *  
Palisades 100        
Perry 1 100        
Point Beach 1 100   345KV OFFSITE LINE Q303 OOS - NO IMPACT ONSITE *  
Point Beach 2 100   345KV OFFSITE LINE Q303 OOS - NO IMPACT ONSITE *  
Prairie Island 1 0 09/11/2009 REFUELING OUTAGE - CORE RELOAD COMPLETE *  
Prairie Island 2 100   CONTINGENCIES IN PLACE FOR BORIC ACID INTEGRATOR PROBLEM    
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 96   INCREASING POWER TO 100% *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 0 09/25/2009 REFUELING OUTAGE    
Diablo Canyon 1 100        
Diablo Canyon 2 0 10/03/2009 REFUELING OUTAGE *  
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100   RESTORATION FOLLOWING MTC TESTING IN PROGRESS *  
Palo Verde 2 0 10/02/2009 REFUELING OUTAGE    
Palo Verde 3 100        
River Bend 1 0 09/20/2009 REFUELING OUTAGE    
San Onofre 2 0 09/26/2009 REFUELING OUTAGE *  
San Onofre 3 100        
South Texas 1 0 09/30/2009 REFUELING OUTAGE    
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.