Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | MINIMUM GENERATION ALERT IN EFFECT | * | ||
Calvert Cliffs 2 | 99 | 100% ELECTRICAL CAPABILITY - MINIMUM GENERATION ALERT IN EFFECT | * | ||
FitzPatrick | 100 | ||||
Ginna | 30 | HOLDING POWER FOR FLUX MAPPING | * | ||
Hope Creek 1 | 100 | 500KV LINE 5022 OOS - MINIMUM MVAR LIMIT IN EFFECT | * | ||
Indian Point 2 | 100 | 138KV LINE 33332 L&M OOS | |||
Indian Point 3 | 100 | 138KV LINE 33332 L&M OOS | |||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 89 | INCREASING POWER TO 100% - COMPLETED ROD SWAP | * | ||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 0 | 09/13/2009 | REFUELING OUTAGE | ||
Pilgrim 1 | 100 | MINIMUM GENERATION ALERT IN EFFECT FROM 0300 - 0800 HRS | * | ||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 0 | 09/30/2009 | REFUELING OUTAGE | ||
Susquehanna 1 | 94 | 100% ELECTRICAL CAPABILITY - MINIMUM GENERATION ALERT IN EFFECT | * | ||
Susquehanna 2 | 94 | 100% ELECTRICAL CAPABILITY - MINIMUM GENERATION ALERT IN EFFECT | * | ||
Three Mile Island 1 | 100 | HIGH GRID VOLTAGE WARNING | |||
Vermont Yankee | 100 | MINIMUM GENERATION ALERT IN EFFECT FROM 0300 - 0800 HRS | * |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | 161 KV OFFSITE LINE OOS - ANTICIPATE RESTORATION ON DAYSHIFT 10/4 | * | ||
Browns Ferry 2 | 20 | GENERATOR OFFLINE - 161 KV OFFSITE LINE OOS - ANTICIPATE RESTORATION ON DAYSHIFT 10/4 | * | ||
Browns Ferry 3 | 100 | 161 KV OFFSITE LINE OOS - ANTICIPATE RESTORATION ON DAYSHIFT 10/4 | * | ||
Brunswick 1 | 97 | WILL PERFORM ROD PATTERN ADJUST | * | ||
Brunswick 2 | 100 | * | |||
Catawba 1 | 100 | * | |||
Catawba 2 | 100 | ||||
Crystal River 3 | 0 | 09/25/2009 | REFUELING OUTAGE | ||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 56 | DOWNPOWER TO TROUBLESHOOT "B" FEEDPUMP WHICH IS OOS | * | ||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 0 | 09/05/2009 | REFUELING OUTAGE | ||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 100 | ||||
Summer | 0 | 10/02/2009 | FORCED OUTAGE | * | |
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 0 | 09/20/2009 | REFUELING OUTAGE - DEFUELED | ||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 0 | 09/20/2009 | REFUELING OUTAGE - DEFUELED |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 0 | 09/13/2009 | REFUELING OUTAGE | ||
Byron 2 | 100 | ||||
Clinton | 18 | INCREASING POWER | * | ||
D.C. Cook 1 | 0 | 03/02/2009 | FORCED OUTAGE | ||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | ||||
Dresden 2 | 98 | 100% ELECTRICAL CAPABILITY | |||
Dresden 3 | 0 | 10/03/2009 | AUTO SCRAM FOLLOWING MSIV CLOSURE SEE EN# 45409 | * | 1 |
Duane Arnold | 100 | ||||
Fermi 2 | 0 | 09/30/2009 | FORCED OUTAGE | ||
Kewaunee | 0 | 09/25/2009 | REFUELING OUTAGE | ||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 93 | ROD PATTERN ADJUST SCHEDULED FOR SUNDAY, 10/04. | * | ||
Palisades | 100 | ||||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | ||||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 0 | 09/11/2009 | REFUELING OUTAGE - CORE RELOAD IN PROGRESS | ||
Prairie Island 2 | 100 | CONTINGENCIES IN PLACE FOR BORIC ACID INTEGRATOR PROBLEM | |||
Quad Cities 1 | 100 | ||||
Quad Cities 2 | 100 |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 15 | SYNC TO GRID | * | ||
Comanche Peak 1 | 100 | * | |||
Comanche Peak 2 | 100 | ||||
Cooper | 0 | 09/25/2009 | REFUELING OUTAGE | ||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 0 | 10/03/2009 | REFUELING OUTAGE | * | |
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 99 | REDUCED POWER FOR MTC TESTING | * | ||
Palo Verde 2 | 0 | 10/02/2009 | REFUELING OUTAGE | * | |
Palo Verde 3 | 100 | ||||
River Bend 1 | 0 | 09/20/2009 | REFUELING OUTAGE | ||
San Onofre 2 | 0 | 09/26/2009 | REFUELING OUTAGE | ||
San Onofre 3 | 100 | ||||
South Texas 1 | 0 | 09/30/2009 | REFUELING OUTAGE | ||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |