Power Reactor Status Report for September 16, 2009
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 100 | * | |||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 100 | ||||
| Ginna | 0 | 09/13/2009 | REFUELING OUTAGE | ||
| Hope Creek 1 | 100 | ||||
| Indian Point 2 | 100 | 138KV LINE 33332 L&M OOS | |||
| Indian Point 3 | 100 | 138KV LINE 33332 L&M OOS | |||
| Limerick 1 | 100 | ||||
| Limerick 2 | 90 | TURBINE CONTROL VALVE SHUT DUE TO EHC LEAK. LICENSEE IS GOING TO 65% FOR MAINTENANCE | * | ||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 0 | 09/13/2009 | REFUELING OUTAGE SEE EN#45348 | * | |
| Pilgrim 1 | 100 | ||||
| Salem 1 | 100 | ||||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 94 | 100% ELECTRICAL CAPABILITY RESTORATION OF TRANSFORMER 20 IN PROGRESS | * | ||
| Susquehanna 2 | 94 | 100% ELECTRICAL CAPABILITY RESTORATION OF TRANSFORMER 20 IN PROGRESS | * | ||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | ONE 161 KV LINE OOS | |||
| Browns Ferry 2 | 100 | ONE 161 KV LINE OOS | |||
| Browns Ferry 3 | 0 | 09/12/2009 | MAINTENANCE OUTAGE ONE 161 KV LINE OOS | ||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 100 | ||||
| Farley 1 | 100 | ||||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 100 | ||||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 0 | 09/05/2009 | REFUELING OUTAGE DEFUELED | ||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 0 | 09/09/2009 | MAINTENANCE OUTAGE DUE TO 2B2 RCP | ||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 94 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 0 | 09/13/2009 | COLD SHUTDOWN | * | |
| Byron 2 | 100 | ||||
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | * | ||
| D.C. Cook 1 | 0 | 03/02/2009 | FORCED OUTAGE - SEE EN #44507 | ||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 100 | ||||
| Dresden 2 | 99 | 100% ELECTRICAL CAPABILITY | * | ||
| Dresden 3 | 100 | ||||
| Duane Arnold | 98 | * | |||
| Fermi 2 | 45 | SINGLE LOOP OPERATION - LOST COOLING WATER TO ONE RECIRC PUMP DURING EECW SURVEILLANCE | * | ||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | ONE 345 KV LINE OOS. | * | ||
| La Salle 2 | 100 | ONE 345 KV LINE OOS | * | ||
| Monticello | 100 | ||||
| Palisades | 100 | ||||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | * | |||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 0 | 09/11/2009 | REFUELING OUTAGE | ||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 100 | ||||
| Quad Cities 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 0 | 09/01/2009 | REFUELING OUTAGE | ||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 92 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Diablo Canyon 1 | 87 | REPAIR FW HEATER TUBES | |||
| Diablo Canyon 2 | 80 | ONE MSSV OUT OF SERVICE | |||
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 93 | COASTDOWN TO REFUELING OUTAGE | * | ||
| San Onofre 2 | 0 | 09/13/2009 | REACTOR TRIP SEE EN#45347 | ||
| San Onofre 3 | 100 | ||||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021