The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for July 1, 2009

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100   MIN GENERATION ALERT IN EFFECT AT 2133 EDT ON 6/30 *  
Calvert Cliffs 2 100   MIN GENERATION ALERT IN EFFECT AT 2133 EDT ON 6/30 *  
FitzPatrick 100        
Ginna 100        
Hope Creek 1 85   REDUCED POWER DUE TO MAIN CONDENSER VACUUM CONCERN IDENTIFIED DURING STEAM JET AIR EJECTOR SWAP *  
Indian Point 2 100   138 KV LINE 33332 L&M FEEDER OOS    
Indian Point 3 100   138 KV LINE 33332 L&M FEEDER OOS    
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 65   REDUCED POWER TO SEARCH FOR AIR LEAK IN OFFGAS SYSTEM *  
Pilgrim 1 100   345 KV LINE 355 OOS    
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 94   100% ELECTRICAL CAPABILITY - MIN GENERATION ALERT IN EFFECT AT 2134 EDT ON 6/30 *  
Susquehanna 2 94   100% ELECTRICAL CAPABILITY - MIN GENERATION ALERT IN EFFECT AT 2134 EDT ON 6/30 *  
Three Mile Island 1 100   MIN GENERATION ALERT IN EFFECT *  
Vermont Yankee 84   SECOND CHLORINATION OF CIRC WATER SYSTEM IN PROGRESS *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 65   REDUCED POWER FOR ROD PATTERN ADJUSTMENT *  
Browns Ferry 3 100     *  
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100   MAINTENANCE ON EAST CLEVELAND OFFSITE POWER LINE    
Sequoyah 2 100   MAINTENANCE ON EAST CLEVELAND OFFSITE POWER LINE    
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 0 03/02/2009 FORCED OUTAGE - SEE EN #44507    
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 98   100% ELECTRICAL CAPABILITY    
Dresden 3 99   100% ELECTRICAL CAPABILITY    
Duane Arnold 100        
Fermi 2 100     *  
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 10   NOT YET SYNCHED TO GRID *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 0 06/30/2009 OUTAGE FOR REPAIRS TO MAIN TRANSFORMER COOLING *  
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 98   LIMITED BY S/G CAPACITY *  
San Onofre 3 99     *  
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.