Power Reactor Status Report for May 13, 2009
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 0 | 04/19/2009 | REFUELING OUTAGE | * | |
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | 138 KV FEEDER 96952 OOS | |||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 0 | 04/17/2009 | REFUELING OUTAGE | ||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | ||||
Susquehanna 1 | 94 | 100% ELECTRICAL CAPABILITY | |||
Susquehanna 2 | 0 | 04/07/2009 | REFUELING OUTAGE | * | |
Three Mile Island 1 | 100 | ||||
Vermont Yankee | 83 | INCREASING POWER AFTER ROD PATTERN EXCHANGE AND PLANNED MAINTENANCE | * |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | ||||
Browns Ferry 2 | 0 | 04/25/2009 | REFUELING OUTAGE | ||
Browns Ferry 3 | 100 | ||||
Brunswick 1 | 100 | ||||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 100 | ||||
Farley 1 | 100 | * | |||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 0 | 05/10/2009 | RX SCRAM - SEE EN #45052 | ||
Hatch 2 | 0 | 02/08/2009 | MAINTENANCE OUTAGE | ||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 0 | 04/24/2009 | REFUELING OUTAGE | ||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 0 | 04/26/2009 | DEFUELED | ||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 70 | FLUX MAP HOLD | * | ||
Surry 2 | 100 | ||||
Turkey Point 3 | 61 | TURBINE CONTROL VALVE ISSUES | * | ||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 100 | ||||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 0 | 03/02/2009 | FORCED OUTAGE - SEE EN #44507 | ||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | ||||
Dresden 2 | 99 | 100% ELECTRICAL CAPABILITY | |||
Dresden 3 | 100 | ||||
Duane Arnold | 100 | ||||
Fermi 2 | 100 | ||||
Kewaunee | 100 | ||||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 55 | HOLDING POWER FOR TESTING | * | ||
Palisades | 100 | ||||
Perry 1 | 9 | TURBINE ROLL-UP IN PROGRESS | * | ||
Point Beach 1 | 100 | ||||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 0 | 04/26/2009 | REFUELING OUTAGE | ||
Quad Cities 2 | 100 |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 0 | 05/08/2009 | REFUELING OUTAGE | * | |
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 80 | REDUCED POWER DUE TO MAINTENANCE ON SWITCHYARD BREAKER (VENUS) TO 345KV OFFSITE LINE | * | ||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 0 | 04/03/2009 | REFUELING OUTAGE | ||
River Bend 1 | 100 | ||||
San Onofre 2 | 98 | 100% ELECTRICAL CAPACITY | * | ||
San Onofre 3 | 100 | * | |||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |