Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Power Reactor Status Report for May 2, 2009

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 0 04/19/2009 REFUELING OUTAGE    
Beaver Valley 2 100        
Calvert Cliffs 1 100     *  
Calvert Cliffs 2 100     *  
FitzPatrick 100     *  
Ginna 100        
Hope Creek 1 0 04/10/2009 EXITING REFUELING OUTAGE    
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 0 04/25/2009 MAINTENANCE OUTAGE - SEE EN #45021    
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 0 04/17/2009 REFUELING OUTAGE    
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 94   100% ELECTRICAL CAPABILITY *  
Susquehanna 2 0 04/07/2009 REFUELING OUTAGE    
Three Mile Island 1 100     *  
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 99   DOWNPOWER FOR CONTROL ROD ADJUSTMENT *  
Browns Ferry 2 0 04/25/2009 REFUELING OUTAGE    
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 93   INCREASING POWER *  
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 0 04/02/2009 EXITING REFUELING OUTAGE *  
Farley 2 100        
Harris 1 0 04/17/2009 REFUELING OUTAGE    
Hatch 1 100        
Hatch 2 0 02/08/2009 MAINTENANCE OUTAGE    
McGuire 1 89   INCREASING POWER FOLLOWING TB VALVE TESTING *  
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 0 04/24/2009 REFUELING OUTAGE    
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 0 04/26/2009 REFUELING OUTAGE    
Sequoyah 1 15   INCREASING POWER PREPS TO SYNC TO GRID *  
Sequoyah 2 100        
Summer 100        
Surry 1 0 04/18/2009 CORE ON-LOAD IN PROGRESS *  
Surry 2 100        
Turkey Point 3 0 03/15/2009 REFUELING OUTAGE *  
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 0 03/02/2009 FORCED OUTAGE - SEE EN #44507 *  
D.C. Cook 2 3   INCREASING POWER; TURBINE BALANCE ISSUE *  
Davis-Besse 100        
Dresden 2 99   100% ELECTRICAL CAPABILITY *  
Dresden 3 99   100% ELECTRICAL CAPABILITY    
Duane Arnold 100        
Fermi 2 75   INCREASING POWER; MIN. GEN. ALERT UNTIL 0600 *  
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 0 03/14/2009 EXITING REFUELING OUTAGE    
Palisades 6   HOLDING FOR A BRIEFING BEFORE SYNCH *  
Perry 1 0 02/22/2009 REFUELING OUTAGE    
Point Beach 1 67   TURBINE TV/GV TESTING *  
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 0 04/26/2009 REFUELING OUTAGE    
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 98   INCREASING FOLLOWING TURBINE VALVE TESTING *  
Columbia Generating Station 89   COASTDOWN TO REFUELING OUTAGE *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 0 04/03/2009 DEFUELED    
River Bend 1 98   INCREASING FOLLOWING PLANNED MAINTENANCE *  
San Onofre 2 99   100% ELECTRICAL CAPABILITY    
San Onofre 3 98   INCREASING FOLLOWING TURBINE VALVE TESTING *  
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 62   HOLDING FOR FEED PUMP ISSUE *  