The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for April 19, 2009

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 60   COASTDOWN TO REFUELING OUTAGE - WILL BE COMING OFFLINE AT 0001 HRS ON 4/20 FOR REFUELING OUTAGE *  
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 0 04/10/2009 REFUELING OUTAGE    
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 99   INCREASING POWER *  
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 0 04/17/2009 REFUELING OUTAGE - DRYWELL HEAD DETENSIONING IN PROGRESS *  
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 94   100% ELECTRICAL CAPABILITY    
Susquehanna 2 0 04/07/2009 REFUELING OUTAGE    
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100   ONE 500 KV LINE (UNION) OOS    
Browns Ferry 2 100   ONE 500 KV LINE (UNION) OOS    
Browns Ferry 3 100   ONE 500 KV LINE (UNION) OOS    
Brunswick 1 100        
Brunswick 2 0 02/27/2009 REFUELING OUTAGE    
Catawba 1 100        
Catawba 2 14   HOLDING POWER - GENERATOR OFFLINE - TURBINE OVERSPEED TRIP TESTING IN PROGRESS *  
Crystal River 3 100        
Farley 1 0 04/02/2009 REFUELING OUTAGE - CORE RELOAD IN PROGRESS *  
Farley 2 100        
Harris 1 0 04/17/2009 REFUELING OUTAGE *  
Hatch 1 100        
Hatch 2 0 02/08/2009 REFUELING OUTAGE    
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100     *  
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 0 03/26/2009 REFUELING OUTAGE *  
Sequoyah 2 100        
Summer 100        
Surry 1 0 04/18/2009 REFUELING OUTAGE *  
Surry 2 100        
Turkey Point 3 0 03/15/2009 REFUELING OUTAGE    
Turkey Point 4 100        
Vogtle 1 100   500KV LINE "WEST MCINTOSH" OOS DUE TO STORM DAMAGE    
Vogtle 2 100   500KV LINE "WEST MCINTOSH" OOS DUE TO STORM DAMAGE    
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 0 03/29/2009 REFUELING OUTAGE - MAKING PREPARATIONS FOR STARTUP    
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 0 03/02/2009 SEE EN #44507.    
D.C. Cook 2 0 03/24/2009 REFUELING OUTAGE    
Davis-Besse 0 04/04/2009 MID-CYCLE OUTAGE *  
Dresden 2 99   100% ELECTRICAL CAPABILITY    
Dresden 3 100        
Duane Arnold 100        
Fermi 2 0 03/27/2009 REFUELING OUTAGE    
Kewaunee 0 04/16/2009 TECH SPEC REQUIRED SHUTDOWN-SEE EN #44994    
La Salle 1 100        
La Salle 2 100        
Monticello 0 03/14/2009 REFUELING OUTAGE    
Palisades 0 03/22/2009 REFUELING OUTAGE    
Perry 1 0 02/22/2009 REFUELING OUTAGE - CORE RELOAD COMPLETED    
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 96   COASTDOWN TO REFUELING OUTAGE    
Quad Cities 2 34   MAINTENANCE ON MAIN CONDENSER *  

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100   72 HOUR LCO WITH ONE LOOP SERVICE WATER INOP *  
Callaway 100        
Columbia Generating Station 65   COASTDOWN TO REFUELING OUTAGE - REDUCED POWER DUE TO FEEDPUMP OOS    
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 0 04/03/2009 DEFUELED    
River Bend 1 100        
San Onofre 2 98   S/G PRESSURE LIMITATION    
San Onofre 3 100        
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.