Power Reactor Status Report for April 18, 2009

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 82   COASTDOWN TO REFUELING OUTAGE *  
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 0 04/10/2009 REFUELING OUTAGE    
Indian Point 2 100        
Indian Point 3 100     *  
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100     *  
Peach Bottom 2 100        
Peach Bottom 3 100     *  
Pilgrim 1 0 04/17/2009 REFUELING OUTAGE *  
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 94   100% ELECTRICAL CAPABILITY    
Susquehanna 2 0 04/07/2009 REFUELING OUTAGE    
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100   ONE 500 KV LINE (UNION) OOS    
Browns Ferry 2 100   ONE 500 KV LINE (UNION) OOS    
Browns Ferry 3 100   ONE 500 KV LINE (UNION) OOS    
Brunswick 1 100        
Brunswick 2 0 02/27/2009 REFUELING OUTAGE    
Catawba 1 100        
Catawba 2 0 03/06/2009 REFUELING OUTAGE *  
Crystal River 3 100        
Farley 1 0 04/02/2009 DEFUELED    
Farley 2 100        
Harris 1 0 04/17/2009 REFUELING OUTAGE *  
Hatch 1 100        
Hatch 2 0 02/08/2009 REFUELING OUTAGE    
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 94   TURBINE CONTROL VALVE TESTING *  
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 0 03/26/2009 REFUELING OUTAGE - PREPARING FOR FINAL RV HEAD SET    
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 0 03/15/2009 REFUELING OUTAGE    
Turkey Point 4 100        
Vogtle 1 100   500KV LINE "WEST MCINTOSH" OOS DUE TO STORM DAMAGE    
Vogtle 2 100   500KV LINE "WEST MCINTOSH" OOS DUE TO STORM DAMAGE    
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 0 03/29/2009 REFUELING OUTAGE - MAKING PREPARATIONS FOR STARTUP *  
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 0 03/02/2009 SEE EN #44507.    
D.C. Cook 2 0 03/24/2009 REFUELING OUTAGE *  
Davis-Besse 0 04/04/2009 MID-CYCLE OUTAGE    
Dresden 2 99   100% ELECTRICAL CAPABILITY *  
Dresden 3 100     *  
Duane Arnold 100        
Fermi 2 0 03/27/2009 REFUELING OUTAGE    
Kewaunee 0 04/16/2009 TECH SPEC REQUIRED SHUTDOWN-SEE EN #44994 *  
La Salle 1 100        
La Salle 2 100        
Monticello 0 03/14/2009 REFUELING OUTAGE    
Palisades 0 03/22/2009 REFUELING OUTAGE    
Perry 1 0 02/22/2009 REFUELING OUTAGE - CORE RELOAD COMPLETED    
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 96   COASTDOWN TO REFUELING OUTAGE    
Quad Cities 2 35   MAINTENANCE ON MAIN CONDENSER *  

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 65   COASTDOWN TO REFUELING OUTAGE - REDUCED POWER DUE TO FEEDPUMP OOS *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 0 04/03/2009 DEFUELED    
River Bend 1 100        
San Onofre 2 98   S/G PRESSURE LIMITATION    
San Onofre 3 100        
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.