Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Power Reactor Status Report for January 15, 2009

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 97   #1 FEED HEATER LEVEL CONTROL MAINTENANCE *  
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 55   ROD SEQUENCE EXCHANGE, PLUGGING A TUBE IN THE MAIN CONDENSER *  
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100   138 KV OUTSIDE FEEDER OOS *  
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100   500 KV LINE 5007 OOS (RING BUS)    
Peach Bottom 3 100   500 KV LINE 5007 OOS (RING BUS)    
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 94   100% ELECTRICAL CAPABILITY    
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100   GENERATION RELIABILITY ALERT AT 1600 *  
Brunswick 2 100   GENERATION RELIABILITY ALERT AT 1600 *  
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100   COLD WEATHER ALERT    
Farley 2 100   COLD WEATHER ALERT    
Harris 1 100   RELIABILITY ALERT FOR COLD WEATHER *  
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100   COLD WEATHER ALERT    
Vogtle 2 100   COLD WEATHER ALERT    
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100   COLD WEATHER ALERT ON GRID UNTIL 1/17    
Braidwood 2 100   COLD WEATHER ALERT ON GRID UNTIL 1/17    
Byron 1 100        
Byron 2 100        
Clinton 96   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 0 09/20/2008 SEE EN #44507.    
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 98   100% ELECTRICAL CAPABILITY *  
Dresden 3 98   100% ELECTRICAL CAPABILITY    
Duane Arnold 88   COASTDOWN TO REFUELING OUTAGE    
Fermi 2 100        
Kewaunee 100        
La Salle 1 100   COLD WEATHER ALERT ON GRID UNTIL 1/17    
La Salle 2 87   COASTDOWN TO REFUELING OUTAGE - COLD WEATHER ALERT ON GRID UNTIL 1/17    
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 98   REDUCED POWER FOR SURVEILLANCE TESTING *  
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 98   100% ELECTRICAL CAPABILITY - COLD WEATHER ALERT ON GRID UNTIL 1/17 *  
Quad Cities 2 96   100% ELECTRICAL CAPABILITY - COLD WEATHER ALERT ON GRID UNTIL 1/17    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 0 01/14/2009 SHUTDOWN ON 1/15 FOR FEEDWATER HEATER REPAIR *  
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100   #2 STARTUP TRANSFORMER TAKEN OOS FOR MAINTENANCE ON 01/13/09 . THIS WILL AFFECT ALL 3 UNITS. *  
Palo Verde 2 100   #2 STARTUP TRANSFORMER TAKEN OOS FOR MAINTENANCE ON 01/13/09 . THIS WILL AFFECT ALL 3 UNITS. *  
Palo Verde 3 100   #2 STARTUP TRANSFORMER TAKEN OOS FOR MAINTENANCE ON 01/13/09. THIS WILL AFFECT ALL 3 UNITS. *  
River Bend 1 100        
San Onofre 2 0 12/27/2008 MAINTENANCE OUTAGE    
San Onofre 3 100        
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

Page Last Reviewed/Updated Wednesday, March 24, 2021

Page Last Reviewed/Updated Wednesday, March 24, 2021