Power Reactor Status Report for November 23, 2008
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 98 | BAD INDICATION ON LEFM | * | ||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 100 | ||||
| Ginna | 100 | ||||
| Hope Creek 1 | 100 | ||||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 99 | CONDENSER DELTA T RESTRICTIONS | * | ||
| Millstone 3 | 0 | 10/11/2008 | CRITICAL - CONDUCTING LOW POWER PHYSICS TESTING | * | |
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 86 | ROD PATTERN ADJUSTMENT | * | ||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 100 | ||||
| Salem 2 | 100 | ||||
| Seabrook 1 | 98 | "C" MOISTURE SEPERATOR REHEATER PROBLEM | * | ||
| Susquehanna 1 | 71 | CONDUCTING SEQUENCE EXCHANGE | * | ||
| Susquehanna 2 | 100 | ||||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 0 | 10/25/2008 | ONE COOLING TOWER TRANSFORMER OOS; REFUELING OUTAGE | ||
| Browns Ferry 2 | 100 | ONE COOLING TOWER TRANSFORMER OOS | |||
| Browns Ferry 3 | 100 | ONE COOLING TOWER TRANSFORMER OOS | |||
| Brunswick 1 | 0 | 11/19/2008 | ENTERING REFUELING OUTAGE | ||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 100 | ||||
| Farley 1 | 100 | ||||
| Farley 2 | 30 | HOLDING FOR CHEMISTRY | * | ||
| Harris 1 | 100 | ||||
| Hatch 1 | 0 | 11/22/2008 | LOSS OF CONDENSATE/FEEDWATER SEE EN #44679 | * | 1 |
| Hatch 2 | 100 | * | |||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | * | |||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 88 | TURBINE VALVE PERFORMANCE TESTING | * | ||
| Oconee 2 | 0 | 10/24/2008 | DEFUELED | ||
| Oconee 3 | 100 | ||||
| Robinson 2 | 0 | 11/18/2008 | SHUTDOWN FOR MAIN GENERATOR SEAL REPLACEMENT | ||
| Saint Lucie 1 | 92 | HOLDING POWER | * | ||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 57 | INCREASING POWER | * | ||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 0 | 09/20/2008 | SEE EN #44507. | ||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 100 | ||||
| Dresden 2 | 96 | 100% ELECTRICAL CAPABILITY | * | ||
| Dresden 3 | 72 | INCREASING POWER | * | ||
| Duane Arnold | 78 | CONTROL ROD SEQUENCE CHANGE DOWNPOWER | * | ||
| Fermi 2 | 100 | ||||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 100 | ||||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 99 | ||||
| Quad Cities 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
| Quad Cities 2 | 97 | 100% ELECTRICAL CAPABILITY |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 0 | 10/26/2008 | DEFUELED | ||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | * | |||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | * | |||
| Palo Verde 2 | 0 | 11/21/2008 | HYDROGEN LEAK IN MAIN GENERATOR | ||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 99 | STEAM GENERATOR LIMITATIONS | |||
| San Onofre 3 | 0 | 10/12/2008 | EXITING REFUELING OUTAGE | ||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021