Power Reactor Status Report for November 8, 2008
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 97 | LIMITED DUE TO 500 KV LINE 5015 OUTAGE (1 OF 3) | |||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | ||||
Millstone 3 | 0 | 10/11/2008 | RX UPPER INTERNALS INSTALLED. | ||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 0 | 10/24/2008 | REFUELING OUTAGE | ||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 100 | * | |||
Salem 1 | 0 | 10/14/2008 | REFUELING OUTAGE | ||
Salem 2 | 87 | DOWNPOWER TO SUPPORT 5015 & 5039 LINE OUTAGE. | |||
Seabrook 1 | 100 | LINE 369 OUTAGE - CONTINGENCY POWER REDUCTION POSSIBLE | |||
Susquehanna 1 | 94 | 100% ELECTRICAL CAPABILITY | |||
Susquehanna 2 | 80 | WATERBOX CLEANING | * | ||
Three Mile Island 1 | 100 | ||||
Vermont Yankee | 0 | 10/18/2008 | REFUELING OUTAGE. |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 0 | 10/25/2008 | ONE COOLING TOWER TRANSFORMER OOS; REFUELING OUTAGE | ||
Browns Ferry 2 | 100 | ONE COOLING TOWER TRANSFORMER OOS | |||
Browns Ferry 3 | 100 | ONE COOLING TOWER TRANSFORMER OOS | |||
Brunswick 1 | 100 | ||||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 100 | ||||
Farley 1 | 100 | ||||
Farley 2 | 0 | 10/19/2008 | REFUELING OUTAGE - DEFUELED | ||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 0 | 09/15/2008 | MANUAL TRIP ROD CONTROL BANK "B". SEE EN #44624. | ||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | * | |||
North Anna 2 | 0 | 10/29/2008 | MAINTENANCE OUTAGE | ||
Oconee 1 | 100 | ||||
Oconee 2 | 0 | 10/24/2008 | DEFUELED | ||
Oconee 3 | 0 | 11/07/2008 | TRIP. SEE EN # 44638. | * | |
Robinson 2 | 30 | HOLDING FOR FLUX MAPPING AND NI CALS | * | ||
Saint Lucie 1 | 0 | 10/19/2008 | REFUELING | ||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 0 | 11/03/2008 | TRIP - SEE EN# 44627. | ||
Summer | 100 | ||||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 100 | ||||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 0 | 09/20/2008 | SEE EN #44507. | ||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | ||||
Dresden 2 | 97 | 100% ELECTRICAL CAPABILITY | * | ||
Dresden 3 | 0 | 11/03/2008 | REFUELING OUTAGE | ||
Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY 11/9/08 - STANDBY XFORMER OFFLINE FOR PLANNED MAINTENANCE (161/345KV) | * | ||
Fermi 2 | 100 | ||||
Kewaunee | 100 | ||||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 100 | ||||
Palisades | 100 | ||||
Perry 1 | 100 | ||||
Point Beach 1 | 0 | 10/04/2008 | REFUELING OUTAGE | ||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 98 | HOLDING POWER WHILE TROUBLESHOOTING ELECTRICAL GENERATOR STATOR TEMP ISSUE | * | ||
Quad Cities 1 | 97 | 100% ELECTRICAL CAPABILITY | * | ||
Quad Cities 2 | 97 | 100% ELECTRICAL CAPABILITY | * |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 0 | 10/26/2008 | DEFUELED ONE OF TWO OFFSITE SOURCES OOS FOR PLANNED MAINTENANCE | * | |
Arkansas Nuclear 2 | 100 | ONE OF TWO OFFSITE SOURCES OOS FOR PLANNED MAINTENANCE | * | ||
Callaway | 28 | HOLDING FOR LOW POWER PHYSICS TESTING/FLUX MAPPING/CHEMISTRY | * | ||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 0 | 10/04/2008 | REFUELING OUTAGE | ||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 100 | ||||
River Bend 1 | 100 | ||||
San Onofre 2 | 99 | STEAM GENERATOR LIMITATIONS | |||
San Onofre 3 | 0 | 10/12/2008 | DEFUELED | ||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | * | |||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021