The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for October 21, 2008

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100     *  
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100   MAINTAIN MINIMUM MVAR FROM SYSOP *  
Indian Point 2 100        
Indian Point 3 100     *  
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 0 10/11/2008 REFUELING OUTAGE    
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 95   COASTDOWN TO REFUELING OUTAGE *  
Peach Bottom 2 20   HOLDING - SYNCHED TO GRID *  
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 0 10/14/2008 REFUELING OUTAGE - DEFUELED *  
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 94   100% ELECTRICAL CAPABILITY    
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 0 10/18/2008 REFUELING OUTAGE    

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100   ONE COOLING TOWER TRANSFORMER OOS; ONE 500KV FEEDER OOS *  
Browns Ferry 2 100   ONE COOLING TOWER TRANSFORMER OOS; ONE 500KV FEEDER OOS *  
Browns Ferry 3 100   ONE COOLING TOWER TRANSFORMER OOS; ONE 500KV FEEDER OOS *  
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 0 10/19/2008 REFUELING OUTAGE    
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 0 09/20/2008 REFUELING OUTAGE    
McGuire 2 100        
North Anna 1 100        
North Anna 2 0 09/13/2008 MAIN GENERATOR MAINTENANCE    
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 0 09/25/2008 DEFUELED    
Saint Lucie 1 0 10/19/2008 REFUELING OUTAGE *  
Saint Lucie 2 100        
Sequoyah 1 100   "YELLOW" GRID STATUS *  
Sequoyah 2 100   "YELLOW" GRID STATUS *  
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 24   HOLDING FOR SYNCHRONIZATION *  
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 0 10/05/2008 REFUELING OUTAGE    
Clinton 97   100% ELECTRICAL CAPABILITY.    
D.C. Cook 1 0 09/20/2008 SEE EN #44507.    
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 99   100% ELECTRICAL CAPABILITY    
Dresden 3 88   COASTDOWN TO REFUELING OUTAGE    
Duane Arnold 98   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100   SCHEDULED SWITCHYARD MAINTENANCE ON TWO BREAKERS FOR THE BALANCE OF THIS WEEK - NO IMPACT ON FACILITY *  
Perry 1 100        
Point Beach 1 0 10/04/2008 DEFUELED    
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 0 09/19/2008 REFUELING OUTAGE    
Quad Cities 1 98   100% ELECTRICAL CAPABILITY    
Quad Cities 2 97   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 0 10/10/2008 DEFUELED *  
Columbia Generating Station 100        
Comanche Peak 1 100     *  
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 1   STARTUP IN PROGRESS - REACTOR SUBCRITICAL *  
Palo Verde 1 0 10/04/2008 DEFUELED    
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 99   100% ELECTRICAL CAPABILITY    
San Onofre 3 0 10/12/2008 REFUELING OUTAGE    
South Texas 1 100        
South Texas 2 0 10/04/2008 REFUELING OUTAGE - CORE RELOADED *  
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.