Power Reactor Status Report for October 2, 2008
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 0 | 09/14/2008 | REFUELING OUTAGE | ||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 98 | HOLDING POWER DUE TO CONTROL VALVE LIMITATION FOR TURBINE | |||
Peach Bottom 2 | 0 | 09/14/2008 | REFUELING OUTAGE | ||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 100 | LOCAL ISO MAY REQUEST STATION TO REDUCE POWER TO 500MW ELECTRICAL NET AS A CONTINGENCY DUE TO WORK ON GRID | |||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | NEW ENGLAND ISO MAY REQUEST STATION TO REDUCE POWER TO 800MW ELECTRICAL NET AS A CONTINGENCY DUE TO WORK ON GRID | |||
Susquehanna 1 | 94 | 100% ELECTRICAL CAPABILITY | |||
Susquehanna 2 | 100 | ||||
Three Mile Island 1 | 100 | ||||
Vermont Yankee | 99 | * |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | ONE COOLING TOWER TRANSFORMER OOS - 161KV TRINITY LINE OOS FOR APPROXIMATELY 36 HOURS | |||
Browns Ferry 2 | 100 | ONE COOLING TOWER TRANSFORMER OOS - 161KV TRINITY LINE OOS FOR APPROXIMATELY 36 HOURS | |||
Browns Ferry 3 | 100 | ONE COOLING TOWER TRANSFORMER OOS - 161KV TRINITY LINE OOS FOR APPROXIMATELY 36 HOURS | |||
Brunswick 1 | 100 | ||||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 100 | ||||
Farley 1 | 100 | ||||
Farley 2 | 99 | COASTDOWN TO REFUELING OUTAGE | |||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 0 | 09/20/2008 | REFUELING OUTAGE - CORE OFFLOAD IN PROGRESS | ||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 0 | 09/13/2008 | REFUELING OUTAGE - CORE RELOAD COMPLETED | ||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 0 | 09/25/2008 | REFUELING OUTAGE | * | |
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 100 | ||||
Vogtle 2 | 0 | 09/14/2008 | DEFUELED | ||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 99 | * | |||
Clinton | 97 | 100% ELECTRICAL CAPABILITY | * | ||
D.C. Cook 1 | 0 | 09/20/2008 | SEE EN #44507. | ||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | ||||
Dresden 2 | 97 | 100% ELECTRICAL CAPABILITY | * | ||
Dresden 3 | 93 | COASTDOWN TO REFUELING OUTAGE | |||
Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY | |||
Fermi 2 | 100 | ||||
Kewaunee | 100 | ||||
La Salle 1 | 3 | STARTUP IN PROGRESS | * | ||
La Salle 2 | 100 | ||||
Monticello | 100 | * | |||
Palisades | 100 | ||||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | ||||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 0 | 09/19/2008 | DEFUELED | ||
Quad Cities 1 | 98 | 100% ELECTRICAL CAPABILITY | |||
Quad Cities 2 | 51 | RECIRC PUMP TRIP DURING LOGIC TESTING | * |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 0 | 09/27/2008 | REFUELING OUTAGE - FUEL MOVEMENT IN PROGRESS | * | |
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 0 | 09/21/2008 | REFUELING OUTAGE - FUEL MOVEMENT IN PROGRESS | * | |
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 76 | NORMAL STARTUP HOLD POINT | * | ||
River Bend 1 | 100 | ||||
San Onofre 2 | 99 | ||||
San Onofre 3 | 65 | REDUCED POWER DUE TO LP EXTRACTION STEAM VALVE BELLOWS LEAK AND CONDENSER TUBE LEAK. MAINTENANCE ONGOING. | * | ||
South Texas 1 | 100 | ||||
South Texas 2 | 87 | COASTDOWN TO REFUELING OUTAGE | * | ||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |