The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for September 25, 2008

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 0 09/14/2008 REFUELING OUTAGE    
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100   1 OF 3 138 KV FEEDERS OOS    
Indian Point 3 100   1 OF 3 138 KV FEEDERS OOS    
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 98   COASTDOWN TO REFUELING OUTAGE *  
Peach Bottom 2 0 09/14/2008 REFUELING OUTAGE    
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100     *  
Seabrook 1 100        
Susquehanna 1 94   100% ELECTRICAL CAPABILITY    
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100   ONE COOLING TOWER TRANSFORMER OOS. ONE 500 KV LINE OOS. *  
Browns Ferry 2 92   POWER REDUCED FOR CONTROL ROD ADJUSTMENT. ONE COOLING TOWER TRANSFORMER OOS. ONE 500 KV LINE OOS. *  
Browns Ferry 3 100   ONE COOLING TOWER TRANSFORMER OOS. ONE 500 KV LINE OOS. *  
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 0 09/20/2008 SHUTDOWN FOR REFUELING OUTAGE    
McGuire 2 100        
North Anna 1 100        
North Anna 2 0 09/13/2008 DEFUELED    
Oconee 1 100        
Oconee 2 19   REDUCED POWER DUE TO MAIN TRANSFORMER OIL LEAK. TG OFFLINE. *  
Oconee 3 100        
Robinson 2 75   DECREASING POWER TOWARDS REFUELING OUTAGE. *  
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100   INTER-TIE XFMR OOS FOR MAINTENANCE.    
Sequoyah 2 100   INTER-TIE XFMR OOS FOR MAINTENANCE.    
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 0 09/14/2008 DEFUELED *  
Watts Bar 1 30   INCREASING POWER. *  

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY.    
D.C. Cook 1 0 09/20/2008 UNUSUAL EVENT DECLARED. SEE EN #44507.    
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 0 09/24/2008 ENTERING FORCED MAINTENANCE OUTAGE. *  
Dresden 3 95   COASTDOWN TO REFUELING OUTAGE    
Duane Arnold 98   100% ELECTRICAL CAPABILITY    
Fermi 2 100   MIN. GENERATION ALERT UNTIL 0500. *  
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 0 09/11/2008 REACTOR SCRAM SEE EN # 44484. PREPARATIONS BEING MADE FOR STARTUP.    
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 0 09/19/2008 REFUELING OUTAGE    
Quad Cities 1 99   100% ELECTRICAL CAPABILITY *  
Quad Cities 2 97   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 93   COASTDOWN TO REFUELING OUTAGE *  
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 0 09/21/2008 REFUELING OUTAGE. RPV HEAD REMOVED.    
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 92   HOLDING FOR FUEL CONDITIONING *  
San Onofre 2 65   FEED WATER PUMP REPAIRS COMPLETE. *  
San Onofre 3 75   REDUCED POWER DUE TO LP EXTRACTION STEAM VALVE BELLOWS LEAK AND CONDENSER TUBE LEAK. MAINTENANCE ONGOING. *  
South Texas 1 100        
South Texas 2 92   COASTDOWN TO REFUELING OUTAGE    
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.