Power Reactor Status Report for September 20, 2008
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | * | |||
Beaver Valley 2 | 72 | MAIN FEED REG VALVE MAINT | * | ||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 0 | 09/14/2008 | REFUELING OUTAGE | ||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | 1 OF 3 138 KV FEEDERS OOS | |||
Indian Point 3 | 100 | 1 OF 3 138 KV FEEDERS OOS | |||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 0 | 09/14/2008 | REFUELING OUTAGE | ||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 100 | ||||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | ||||
Susquehanna 1 | 94 | 100% ELECTRICAL CAPABILITY MIN GEN ALERT | * | ||
Susquehanna 2 | 100 | MIN GEN ALERT | * | ||
Three Mile Island 1 | 100 | MIN GEN ALERT | * | ||
Vermont Yankee | 100 | * |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | ONE COOLING TOWER TRANSFORMER OOS. | * | ||
Browns Ferry 2 | 0 | 09/17/2008 | ONE COOLING TOWER TRANSFORMER OOS. MAINTENANCE OUTAGE TO REPAIR GENERATOR HYDROGEN COOLER | * | |
Browns Ferry 3 | 100 | ONE COOLING TOWER TRANSFORMER OOS. | * | ||
Brunswick 1 | 100 | ||||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 100 | ||||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 20 | SHUTDOWN FOR REFUELING OUTAGE | * | ||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 0 | 09/13/2008 | REFUELING OUTAGE; CORE OFFLOAD IN PROGRESS | * | |
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 100 | ||||
Vogtle 2 | 0 | 09/14/2008 | REFUELING OUTAGE | * | |
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | * | |||
Braidwood 2 | 100 | * | |||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 96 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | ||||
Dresden 2 | 99 | 100% ELECTRICAL CAPABILITY | |||
Dresden 3 | 97 | COASTDOWN TO REFUELING OUTAGE | * | ||
Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY | |||
Fermi 2 | 100 | DOUBLE CIRCUIT TOWER CONTINGENCY UNTIL 9/26 | * | ||
Kewaunee | 100 | ||||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 0 | 09/11/2008 | REACTOR SCRAM SEE EN # 44484. 1R AND 2 R TRANSFORMERS OUT OF SERVICE | ||
Palisades | 100 | ||||
Perry 1 | 63 | DOWNPOWER FOR SCRAM TIME TESTING, CONTROL ROD ADJUSTMENTS AND TURBINE VALVE TESTING. | * | ||
Point Beach 1 | 100 | AUX FEED TESTING | * | ||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 0 | 09/19/2008 | PREPARE FOR REFUELING OUTAGE | * | |
Quad Cities 1 | 98 | 100% ELECTRICAL CAPABILITY | |||
Quad Cities 2 | 97 | 100% ELECTRICAL CAPABILITY |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 98 | COASTDOWN TO REFUELING OUTAGE | * | ||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 98 | COASTDOWN TO REFUELING OUTAGE | |||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 1 | COMMENCING PLANT STARTUP | * | ||
River Bend 1 | 0 | 09/01/2008 | SEE EN# 44457. | ||
San Onofre 2 | 99 | STEAM GENERATOR PRESSURE LIMITATION | |||
San Onofre 3 | 95 | REDUCED POWER DUE TO LP EXTRACTION STEAM VALVE BELLOWS LEAK. | |||
South Texas 1 | 100 | ||||
South Texas 2 | 96 | COASTDOWN TO REFUELING OUTAGE | |||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021