Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 94   INCREASING POWER *  
Calvert Cliffs 2 100        
FitzPatrick 97   COASTDOWN TO ROD PATTERN ADJUSTMENT    
Ginna 100        
Hope Creek 1 97   100% ELECTRICAL CAPABILITY    
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 97   #3 STARTUP SOURCE OOS COASTDOWN TO REFUELING OUTAGE *  
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 94   NEW NSSS LIMIT DUE TO POWER UPRATE    
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 100     *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 08/08/2008 RX SHUTDOWN TO REPAIR STEAM LEAK. SEE EN#44400. *  
Browns Ferry 2 100     *  
Browns Ferry 3 75   REDUCED POWER DUE TO OOS COOLING TOWER TRANSFORMER. SEE EN#44392 *  
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 67   REDUCED TO REPAIR STEAM LEAK ON #6HP HEATER TO DRAIN TANK LINE *  
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100     *  
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 99   100% ELECTRICAL CAPABILITY    
Watts Bar 1 0 08/06/2008 MANUAL TRIP. SEE EN #44388.    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 99   100% ELECTRICAL CAPABILITY *  
Dresden 3 99   100% ELECTRICAL CAPABILITY *  
Duane Arnold 98   100% ELECTRICAL CAPABILITY    
Fermi 2 95   INCREASING POWER AFTER PLANNED MAINTENANCE *  
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 8   SYNCHING TO THE GRID AND INCREASING POWER *  
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 99   100% ELECTRICAL CAPABILITY *  
Quad Cities 2 98   100% ELECTRICAL CAPABILITY *  

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 0 08/08/2008 REACTOR SCRAM DURING TURBINE VALVE TESTING    
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100     *  
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 99   STEAM GENERATOR PRESSURE LIMITATIONS *  
San Onofre 3 100        
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 90   POWER REDUCED FOR SECONDARY SIDE MAINTENANCE    