Power Reactor Status Report for June 1, 2008
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 95 | HOLDING FOR POWER UPRATE TESTING | |||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 99 | REDUCED POWER FOR WATERBOX CLEANING | * | ||
| FitzPatrick | 98 | HOLDING FOR ROD PATTERN ADJUSTMENT ON 6/1/08. | |||
| Ginna | 100 | ||||
| Hope Creek 1 | 95 | LIMITED IN POWER LEVEL DUE TO POWER UPRATE TESTING | |||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 98 | INCREASING POWER TO 100% | * | ||
| Oyster Creek | 100 | * | |||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 100 | ||||
| Salem 2 | 99 | SECONDARY ISSUES RESOLVED - ANTICIPATE INCREASING POWER SHORTLY | * | ||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 94 | STABLE AT NEW NSSS LIMIT DUE TO POWER UPRATE | |||
| Susquehanna 2 | 100 | VOLTAGE REGULATOR IN MANUAL | |||
| Three Mile Island 1 | 100 | * | |||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | 500 KV TRINITY LINE OOS UNTIL 6/9/08 | |||
| Browns Ferry 2 | 68 | 500 KV TRINITY LINE OOS UNTIL 6/9/08 - REDUCED POWER FOR PLANNED MAINTENANCE | * | ||
| Browns Ferry 3 | 100 | 500 KV TRINITY LINE OOS UNTIL 6/9/08 | |||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 0 | 05/03/2008 | REFUELING OUTAGE | ||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 100 | ||||
| Farley 1 | 100 | ||||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 100 | ||||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | * | |||
| McGuire 2 | 100 | ||||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 18 | HOLDING POWER WITH GENERATOR OFFLINE | * | ||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 0 | 05/04/2008 | EXITING REFUELING OUTAGE. | ||
| Summer | 0 | 04/25/2008 | EXITING REFUELING OUTAGE. | ||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 98 | 100% ELECTRICAL CAPABILITY | |||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | * | |||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 96 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 100 | ||||
| Dresden 2 | 85 | HOLDING FOR TURBINE VALVE TESTING AND SCRAM TIME TESTING. UNIT SHOULD BE AT FULL POWER BY 1200 TODAY. | * | ||
| Dresden 3 | 99 | 100% ELECTRICAL CAPABILITY | |||
| Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY | |||
| Fermi 2 | 89 | HOLDING FOR TURBINE VALVE /PRESSURE GAUGE REPLACEMENT AND ROD PATTERN ADJUSTMENT. UNIT AT FULL POWER BY 1800 TODAY. | * | ||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 100 | ||||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 99 | POWER REDUCED DUE TO CALORIMETRIC MONITORING ISSUE | |||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
| Quad Cities 2 | 96 | 100% ELECTRICAL CAPABILITY |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 65 | REDUCED POWER PER LOAD DISPATCHER REQUEST | |||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 0 | 04/19/2008 | REFUELING OUTAGE; RAUN TRANSMISSION LINE (1 OF 3) OOS | ||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 12 | INCREASING POWER | * | ||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 20 | CONTROLLED SHUTDOWN TO REPLACE INSULATORS ON TRANSFORMER. OUTAGE IS SCHEDULED FOR 24 HOURS | * | ||
| San Onofre 3 | 98 | ||||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 10 | INCREASING POWER | * | ||
| Wolf Creek 1 | 100 |