The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for May 29, 2008

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 96   HOLDING FOR POWER UPRATE TESTING - SCHEDULED FOR DAY SHIFT TODAY *  
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 98   INCREASING POWER *  
Ginna 100        
Hope Creek 1 96   LIMITED IN POWER LEVEL DUE TO POWER UPRATE TESTING    
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 81   INCREASING POWER *  
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100   220KV LINE #220-08 WILL BE BLOCKED STARTING AT 0400EDT ON 5/29/08 FOR PLANNED MAINTENANCE (1 OF 3 OFFSITE LINES)    
Peach Bottom 3 89   ROD PATTERN ADJUSTMENT 220KV LINE #220-08 WILL BE BLOCKED STARTING AT 0400EDT ON 5/29/08 FOR PLANNED MAINTENANCE (1 OF 3 OFFSITE LINES) *  
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 94   STABLE AT NEW NSSS LIMIT DUE TO POWER UPRATE    
Susquehanna 2 100   VOLTAGE REGULATOR IN MANUAL    
Three Mile Island 1 100        
Vermont Yankee 100     *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100   500 KV TRINITY LINE OOS UNTIL 6/9/08 *  
Browns Ferry 2 100   500 KV TRINITY LINE OOS UNTIL 6/9/08 *  
Browns Ferry 3 100   500 KV TRINITY LINE OOS UNTIL 6/9/08 *  
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 0 05/03/2008 DEFUELED    
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 0 04/11/2008 EXITING REFUELING OUTAGE *  
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 0 05/04/2008 EXITING REFUELING OUTAGE. *  
Summer 0 04/25/2008 EXITING REFUELING OUTAGE. *  
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 98   100% ELECTRICAL CAPABILITY    
Watts Bar 1 92   HOLDING FOR 12-HR SOAK *  

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 96   100% ELECTRICAL CAPABILITY; MIN. GENERATION ALERT    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 98   100% ELECTRICAL CAPABILITY *  
Dresden 3 99   100% ELECTRICAL CAPABILITY    
Duane Arnold 98   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 99   POWER REDUCED DUE TO CALORIMETRIC MONITORING ISSUE    
Prairie Island 2 100        
Quad Cities 1 97   100% ELECTRICAL CAPABILITY    
Quad Cities 2 97   100% ELECTRICAL CAPABILITY *  

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 85   REDUCED POWER PER LOAD DISPATCHER REQUEST *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 04/19/2008 REFUELING OUTAGE    
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 0 03/28/2008 MANUAL REACTOR TRIP DUE TO IMPROPER MOVEMENT OF CEAs - SEE EN # 44246 * 1
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 99   STEAM GENERATOR LIMITATIONS    
San Onofre 3 80   HOLDING POWER FOR FUEL ECONOMY    
South Texas 1 100        
South Texas 2 100        
Waterford 3 0 04/26/2008 REFUELING OUTAGE *  
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021