Power Reactor Status Report for May 29, 2008

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 96   HOLDING FOR POWER UPRATE TESTING - SCHEDULED FOR DAY SHIFT TODAY *  
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 98   INCREASING POWER *  
Ginna 100        
Hope Creek 1 96   LIMITED IN POWER LEVEL DUE TO POWER UPRATE TESTING    
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 81   INCREASING POWER *  
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100   220KV LINE #220-08 WILL BE BLOCKED STARTING AT 0400EDT ON 5/29/08 FOR PLANNED MAINTENANCE (1 OF 3 OFFSITE LINES)    
Peach Bottom 3 89   ROD PATTERN ADJUSTMENT 220KV LINE #220-08 WILL BE BLOCKED STARTING AT 0400EDT ON 5/29/08 FOR PLANNED MAINTENANCE (1 OF 3 OFFSITE LINES) *  
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 94   STABLE AT NEW NSSS LIMIT DUE TO POWER UPRATE    
Susquehanna 2 100   VOLTAGE REGULATOR IN MANUAL    
Three Mile Island 1 100        
Vermont Yankee 100     *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100   500 KV TRINITY LINE OOS UNTIL 6/9/08 *  
Browns Ferry 2 100   500 KV TRINITY LINE OOS UNTIL 6/9/08 *  
Browns Ferry 3 100   500 KV TRINITY LINE OOS UNTIL 6/9/08 *  
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 0 05/03/2008 DEFUELED    
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 0 04/11/2008 EXITING REFUELING OUTAGE *  
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 0 05/04/2008 EXITING REFUELING OUTAGE. *  
Summer 0 04/25/2008 EXITING REFUELING OUTAGE. *  
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 98   100% ELECTRICAL CAPABILITY    
Watts Bar 1 92   HOLDING FOR 12-HR SOAK *  

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 96   100% ELECTRICAL CAPABILITY; MIN. GENERATION ALERT    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 98   100% ELECTRICAL CAPABILITY *  
Dresden 3 99   100% ELECTRICAL CAPABILITY    
Duane Arnold 98   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 99   POWER REDUCED DUE TO CALORIMETRIC MONITORING ISSUE    
Prairie Island 2 100        
Quad Cities 1 97   100% ELECTRICAL CAPABILITY    
Quad Cities 2 97   100% ELECTRICAL CAPABILITY *  

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 85   REDUCED POWER PER LOAD DISPATCHER REQUEST *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 04/19/2008 REFUELING OUTAGE    
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 0 03/28/2008 MANUAL REACTOR TRIP DUE TO IMPROPER MOVEMENT OF CEAs - SEE EN # 44246 * 1
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 99   STEAM GENERATOR LIMITATIONS    
San Onofre 3 80   HOLDING POWER FOR FUEL ECONOMY    
South Texas 1 100        
South Texas 2 100        
Waterford 3 0 04/26/2008 REFUELING OUTAGE *  
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021