Power Reactor Status Report for May 19, 2008
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 0 | 04/14/2008 | HODING FOR TURBINE #2 BEARING REPAIRS | * | |
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 99 | ROD PATTERN AND RECIRC FLOW ADJUSTMENTS | * | ||
Ginna | 100 | * | |||
Hope Creek 1 | 87 | 100% ELECTRICAL CAPABILITY | * | ||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | MONITORING A GENERATOR EXCITER COOLING FLOW LK. | * | ||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | 500KV LINE (220-34) OOS FOR MAINTENANCE UNTIL 5/19 | |||
Peach Bottom 3 | 100 | 500KV LINE (220-34) OOS FOR MAINTENANCE UNTIL 5/19 | |||
Pilgrim 1 | 100 | ||||
Salem 1 | 100 | ||||
Salem 2 | 85 | INCREASING POWER | * | ||
Seabrook 1 | 100 | ||||
Susquehanna 1 | 94 | STABLE AT NEW NSSS LIMIT DUE TO POWER UPRATE | * | ||
Susquehanna 2 | 100 | VOLTAGE REGULATOR IN MANUAL | |||
Three Mile Island 1 | 100 | MIN GENERATION ALERT | * | ||
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 78 | 500 KV TRINITY LINE OOS UNTIL 6/9/08. LOW PRES. HTR. WORK | * | ||
Browns Ferry 2 | 100 | 500 KV TRINITY LINE OOS UNTIL 6/9/08. | |||
Browns Ferry 3 | 60 | 500 KV TRINITY LINE OOS UNTIL 6/9/08. INCREASING POWER | * | ||
Brunswick 1 | 100 | ||||
Brunswick 2 | 100 | ||||
Catawba 1 | 0 | 05/03/2008 | REFUELING OUTAGE. DEFUELED | ||
Catawba 2 | 100 | ||||
Crystal River 3 | 99 | MONITORING FW FLOW PERTURBATIONS | * | ||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | SWITCHYARD WORK ON 5/19 | * | ||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 0 | 04/11/2008 | REFUELING OUTAGE | ||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | * | |||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | YELLOW GRID | |||
Sequoyah 2 | 0 | 05/04/2008 | REFUELING OUTAGE. YELLOW GRID. | ||
Summer | 0 | 04/25/2008 | REFUELING OUTAGE | ||
Surry 1 | 100 | * | |||
Surry 2 | 0 | 04/26/2008 | REFUELING OUTAGE | * | |
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 99 | 100% ELECTRICAL CAPACITY | * | ||
Vogtle 2 | 98 | 100% ELECTRICAL CAPABILITY | |||
Watts Bar 1 | 0 | 05/17/2008 | DOWN TO REPAIR A STATOR COOLING WATER LEAK |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 72 | INCREASING POWER | * | ||
Byron 1 | 100 | MIN. GEN. ALERT UNTIL 0600 CDT | * | ||
Byron 2 | 100 | MIN. GEN. ALERT UNTIL 0600 CDT | * | ||
Clinton | 97 | MIN. GEN. ALERT | * | ||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 100 | * | |||
Davis-Besse | 100 | ||||
Dresden 2 | 99 | 100% ELECTRICAL CAPABILITY MIN. GEN. ALERT UNTIL 0600 CDT | * | ||
Dresden 3 | 99 | 100% ELECTRICAL CAPABILITY MIN. GEN. ALERT UNTIL 0600 CDT | * | ||
Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY | |||
Fermi 2 | 100 | ||||
Kewaunee | 100 | ||||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | * | |||
Monticello | 100 | * | |||
Palisades | 100 | ||||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | * | |||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
Quad Cities 2 | 96 | 100% ELECTRICAL CAPABILITY | * |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | * | |||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 22 | INCREASING POWER | * | ||
Diablo Canyon 1 | 100 | * | |||
Diablo Canyon 2 | 100 | * | |||
Fort Calhoun | 0 | 04/19/2008 | REFUELING OUTAGE. DEFUELED | ||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 0 | 03/28/2008 | REFUELING OUTAGE | ||
Palo Verde 3 | 100 | ||||
River Bend 1 | 100 | ||||
San Onofre 2 | 100 | * | |||
San Onofre 3 | 80 | HOLDING POWER FOR FUEL ECONOMY | |||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 0 | 04/26/2008 | REFUELING OUTAGE | ||
Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021