Power Reactor Status Report for May 18, 2008
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 0 | 04/14/2008 | PERFORMING PLANT STARTUP | ||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 100 | ||||
| Ginna | 99 | * | |||
| Hope Creek 1 | 87 | ADMINISTRATIVE LIMIT DUE TO POWER UPRATE | * | ||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | * | |||
| Limerick 2 | 100 | ||||
| Millstone 2 | 100 | * | |||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | 500KV LINE (220-34) OOS FOR MAINTENANCE UNTIL 5/19 | |||
| Peach Bottom 3 | 100 | 500KV LINE (220-34) OOS FOR MAINTENANCE UNTIL 5/19 | |||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 100 | ||||
| Salem 2 | 74 | INCREASING POWER | * | ||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 77 | HOLDING POWER FOR MAINTENANCE | * | ||
| Susquehanna 2 | 100 | VOLTAGE REGULATOR IN MANUAL | |||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | 500 KV TRINITY LINE OOS UNTIL 6/9/08. | |||
| Browns Ferry 2 | 100 | 500 KV TRINITY LINE OOS UNTIL 6/9/08. | |||
| Browns Ferry 3 | 37 | 500 KV TRINITY LINE OOS UNTIL 6/9/08. HOLDING FOR SCRAM TIME TESTING. | * | ||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 0 | 05/03/2008 | REFUELING OUTAGE. DEFUELED | ||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 100 | ||||
| Farley 1 | 100 | ||||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 100 | ||||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 0 | 04/11/2008 | REFUELING OUTAGE | ||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 100 | EAST 115KV BUS OOS FOR MAINTENANCE | * | ||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | YELLOW GRID | |||
| Sequoyah 2 | 0 | 05/04/2008 | REFUELING OUTAGE. YELLOW GRID. | * | |
| Summer | 0 | 04/25/2008 | REFUELING OUTAGE | ||
| Surry 1 | 100 | ||||
| Surry 2 | 0 | 04/26/2008 | REFUELING OUTAGE | ||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 99 | * | |||
| Vogtle 2 | 98 | 100% ELECTRICAL CAPABILITY | |||
| Watts Bar 1 | 0 | 05/17/2008 | DOWN TO REPAIR A STATOR COOLING WATER LEAK | * |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 48 | INCREASING POWER | * | ||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 79 | ROD SEQUENCE EXCHANGE; MIN. GEN. ALERT | * | ||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 11 | INCREASING POWER | * | ||
| Davis-Besse | 100 | ||||
| Dresden 2 | 99 | 100% ELECTRICAL CAPABILITY | * | ||
| Dresden 3 | 99 | 100% ELECTRICAL CAPABILITY | * | ||
| Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY | |||
| Fermi 2 | 100 | ||||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | ||||
| La Salle 2 | 53 | LOAD DROP FOR SURVEILANCES INCLUDING TURBINE VALVES AND EHC | * | ||
| Monticello | 98 | INCREASING POWER FOLLOWING SCRAM TIME TESTING | * | ||
| Palisades | 100 | ||||
| Perry 1 | 100 | ||||
| Point Beach 1 | 53 | INCREASING POWER FOLLOWING FEED PUMP MAINTENANCE | * | ||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
| Quad Cities 2 | 80 | ROD SHUFFLE | * |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 99 | * | |||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 17 | HOLDING FOR TURBINE TESTING | * | ||
| Diablo Canyon 1 | 100 | DIABLO-MESA 230 KV LINE OOS UNTIL 5/19 | * | ||
| Diablo Canyon 2 | 100 | DIABLO-MESA 230 KV LINE OOS UNTIL 5/19 | * | ||
| Fort Calhoun | 0 | 04/19/2008 | REFUELING OUTAGE. DEFUELED | ||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 0 | 03/28/2008 | REFUELING OUTAGE | ||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 99 | * | |||
| San Onofre 3 | 80 | HOLDING POWER FOR FUEL ECONOMY | |||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 0 | 04/26/2008 | REFUELING OUTAGE | ||
| Wolf Creek 1 | 100 | * |