The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for May 17, 2008

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 0 04/14/2008 PERFORMING PLANT STARTUP *  
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100     *  
Ginna 90   INCREASING POWER *  
Hope Creek 1 87   NEW FULL ACHIEVABLE POWER WITH POWER UPRATE. *  
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 86   INCREASING POWER *  
Limerick 2 100        
Millstone 2 76   INCREASING POWER *  
Millstone 3 100        
Nine Mile Point 1 100     *  
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100   500KV LINE (220-34) OOS FOR MAINTENANCE UNTIL 5/19 *  
Peach Bottom 3 100   500KV LINE (220-34) OOS FOR MAINTENANCE UNTIL 5/19 *  
Pilgrim 1 100        
Salem 1 100        
Salem 2 45   HOLDING *  
Seabrook 1 100        
Susquehanna 1 69   WATERBOX CLEANING, COND. PUMP TRIP TEST, SCRAM TIME TESTING *  
Susquehanna 2 100   VOLTAGE REGULATOR IN MANUAL    
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100   500 KV TRINITY LINE OOS UNTIL 6/9/08.    
Browns Ferry 2 100   500 KV TRINITY LINE OOS UNTIL 6/9/08.    
Browns Ferry 3 17   500 KV TRINITY LINE OOS UNTIL 6/9/08. HOLDING FOR MAIN GENERATOR REPAIR. *  
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 0 05/03/2008 REFUELING OUTAGE. DEFUELED    
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100     *  
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 0 04/11/2008 REFUELING OUTAGE    
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100   YELLOW GRID *  
Sequoyah 2 0 05/04/2008 REFUELING OUTAGE. DEFUELED. YELLOW GRID. *  
Summer 0 04/25/2008 REFUELING OUTAGE    
Surry 1 100        
Surry 2 0 04/26/2008 REFUELING OUTAGE    
Turkey Point 3 100        
Turkey Point 4 100     *  
Vogtle 1 100        
Vogtle 2 98   100% ELECTRICAL CAPABILITY    
Watts Bar 1 83   WILL BE COMING OFFLINE @ 1500 EDT TO REPAIR A STATOR COOLING WATER LEAK *  

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 15   INCREASING POWER *  
Byron 1 100        
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY TSO HAS ISSUED A MIN. GEN. ALERT *  
D.C. Cook 1 100        
D.C. Cook 2 50   COMING OFFLINE FOR SCHEDULED MAINTENANCE OUTAGE *  
Davis-Besse 100        
Dresden 2 98   100% ELECTRICAL CAPABILITY    
Dresden 3 98   100% ELECTRICAL CAPABILITY    
Duane Arnold 98   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 65   REDUCED POWER FOR TURBINE TESTING *  
Point Beach 2 100     *  
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 97   100% ELECTRICAL CAPABILITY    
Quad Cities 2 97   100% ELECTRICAL CAPABILITY *  

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 61   REDUCED POWER DUE TO LOSS OF 500KV MABELVALE LINE *  
Arkansas Nuclear 2 100        
Callaway 100     *  
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 0 04/11/2008 PERFORMING PLANT STARTUP *  
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 04/19/2008 REFUELING OUTAGE. DEFUELED    
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 0 03/28/2008 REFUELING OUTAGE    
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 95   REDUCED POWER FOR TURBINE VALVE TESTING *  
San Onofre 3 80   HOLDING POWER FOR FUEL ECONOMY    
South Texas 1 100        
South Texas 2 100        
Waterford 3 0 04/26/2008 REFUELING OUTAGE *  
Wolf Creek 1 97   INCREASING POWER *  

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.