Power Reactor Status Report for April 24, 2008
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 0 | 04/14/2008 | REFUELING OUTAGE | ||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | ||||
Ginna | 0 | 04/20/2008 | ENTERING REFUELING OUTAGE | * | |
Hope Creek 1 | 100 | 500 KV LINE #5021 OOS | |||
Indian Point 2 | 91 | INCREASING POWER | * | ||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 0 | 04/05/2008 | DEFUELED | ||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | , | |||
Oyster Creek | 92 | HOLDING POWER FOR CONTROL VALVE OSCILLATION PROBLEM AND FEEDWATER HEATER ISSUES | |||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 100 | ||||
Salem 1 | 100 | 500 KV LINE #5021 OOS | |||
Salem 2 | 0 | 03/11/2008 | DEFUELED; 500 KV LINE #5021 OOS | ||
Seabrook 1 | 0 | 03/31/2008 | EXITING REFUELING OUTAGE, 345 KV (BUS 3) OOS | * | |
Susquehanna 1 | 79 | HOLDING POWER FOR POWER UPRATE TESTING | * | ||
Susquehanna 2 | 100 | VOLTAGE REGULATOR IN MANUAL | |||
Three Mile Island 1 | 100 | ||||
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | ||||
Browns Ferry 2 | 100 | ||||
Browns Ferry 3 | 0 | 03/18/2008 | REFUELING OUTAGE | ||
Brunswick 1 | 0 | 03/14/2008 | EXITING REFUELING OUTAGE | * | |
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 100 | ||||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 99 | HOLDING FOR SOAK ON SRV | |||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 0 | 04/11/2008 | DEFUELED | ||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 87 | COASTDOWN TO REFUELING OUTAGE | * | ||
Summer | 85 | HOLDING POWER FOLLOWING SV TESTING UNTIL RFO COMMENCES | |||
Surry 1 | 100 | ||||
Surry 2 | 94 | COASTDOWN TO REFUELING | * | ||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 0 | 03/30/2008 | REFUELING OUTAGE | ||
Vogtle 1 | 27 | HOLDING POWER WHILE PERFORMING GENERATOR TESTING | * | ||
Vogtle 2 | 98 | 100% ELECTRICAL CAPABILITY. | |||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 0 | 04/20/2008 | REFUELING OUTAGE | * | |
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 96 | 100% ELECTRICAL CAPABILITY | * | ||
D.C. Cook 1 | 0 | 03/25/2008 | REFUELING OUTAGE | ||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | ||||
Dresden 2 | 99 | 100% ELECTRICAL CAPABILITY | |||
Dresden 3 | 99 | 100% ELECTRICAL CAPABILITY | |||
Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY | |||
Fermi 2 | 100 | ||||
Kewaunee | 0 | 03/28/2008 | DEFUELED | ||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 100 | ||||
Palisades | 100 | ||||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | * | |||
Point Beach 2 | 0 | 04/05/2008 | REFUELING OUTAGE | * | |
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
Quad Cities 2 | 96 | 100% ELECTRICAL CAPABILITY |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | * | |||
Cooper | 0 | 04/11/2008 | REFUELING OUTAGE | ||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 0 | 04/19/2008 | REFUELING OUTAGE | ||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 99 | HIGH RATE S/G BLOWDOWNS | * | ||
Palo Verde 2 | 0 | 03/28/2008 | DEFUELED | ||
Palo Verde 3 | 100 | ||||
River Bend 1 | 100 | ||||
San Onofre 2 | 99 | ||||
San Onofre 3 | 0 | 04/16/2008 | PLANNED SHUTDOWN IN ORDER TO CONSERVE FUEL FOR SUMMER LOADS - WILL MAINTAIN UNIT IN MODE 3 (HOT STANDBY) | ||
South Texas 1 | 0 | 03/29/2008 | REFUELING OUTAGE | ||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 0 | 03/17/2008 | REFUELING OUTAGE |