Power Reactor Status Report for April 21, 2008
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 0 | 04/14/2008 | REFUELING OUTAGE | ||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | ||||
Ginna | 0 | 04/20/2008 | REFUELING OUTAGE | * | |
Hope Creek 1 | 100 | 500 KV LINE #5021 OOS | |||
Indian Point 2 | 29 | HOLDING POWER FOR CHEMISTRY | * | ||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 0 | 04/05/2008 | DEFUELED | ||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | , | * | ||
Oyster Creek | 92 | HOLDING POWER FOR CONTROL VALVE OSCILLATION PROBLEM AND FEEDWATER HEATER ISSUES | |||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 100 | ||||
Salem 1 | 80 | 500 KV LINE OOS FOR MAINTENANCE FIRE UNDER TRANSMISSION LINES OFF SITE | * | ||
Salem 2 | 0 | 03/11/2008 | DEFUELED - 500 KV LINE OOS FOR MAINTENANCE | ||
Seabrook 1 | 0 | 03/31/2008 | 345 KV (BUS 2) OOS - EXPECT RETURN TO SERVICE ON 4/23 | * | |
Susquehanna 1 | 71 | HOLDING POWER FOR TESTING | * | ||
Susquehanna 2 | 100 | VOLTAGE REGULATOR IN MANUAL | |||
Three Mile Island 1 | 100 | MINIMUM GENERATION ALERT FROM PJM - NO IMPACT ON PLANT | |||
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 70 | INCREASING POWER | * | ||
Browns Ferry 2 | 100 | ||||
Browns Ferry 3 | 0 | 03/18/2008 | REFUELING OUTAGE | ||
Brunswick 1 | 0 | 03/14/2008 | REFUELING OUTAGE | ||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 100 | ||||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 99 | HOLDING FOR SOAK ON SRV | * | ||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 98 | HOLDING POWER FOR TESTING | * | ||
North Anna 1 | 100 | * | |||
North Anna 2 | 100 | ||||
Oconee 1 | 0 | 04/11/2008 | REFUELING OUTAGE - DEFUELING IN PROGRESS | ||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 90 | COASTDOWN TO REFUELING OUTAGE | * | ||
Summer | 100 | ||||
Surry 1 | 0 | 04/16/2008 | MANUAL TRIP DUE TO MAIN TURBINE VIBRATION. SEE EN #44152 | * | 1 |
Surry 2 | 96 | COASTDOWN TO REFUELING | |||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 0 | 03/30/2008 | DEFUELED | ||
Vogtle 1 | 0 | 03/15/2008 | EXITING REFUELING OUTAGE | * | |
Vogtle 2 | 98 | 100% ELECTRICAL CAPABILITY. | |||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 0 | 04/20/2008 | REFUELING OUTAGE - RCS COOLDOWN IN PROGRESS | * | |
Byron 1 | 98 | HOLDING POWER FOR PRECONDITIONING | * | ||
Byron 2 | 100 | ||||
Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 0 | 03/25/2008 | REFUELING OUTAGE | ||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | ||||
Dresden 2 | 99 | 100% ELECTRICAL CAPABILITY | * | ||
Dresden 3 | 99 | 100% ELECTRICAL CAPABILITY | |||
Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY | |||
Fermi 2 | 100 | * | |||
Kewaunee | 0 | 03/28/2008 | DEFUELED | ||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 100 | ||||
Palisades | 100 | ||||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | TRANSFORMER 2X04 OOS - GRID VOLTAGE IS EXPECTED TO DIP WHEN KEWAUNEE ENERGIZES NEW TRANSFORMER ON 04/23 | * | ||
Point Beach 2 | 0 | 04/05/2008 | DEFUELED - TRANSFORMER 2X04 OOS - GRID VOLTAGE IS EXPECTED TO DIP WHEN KEWAUNEE ENERGIZES NEW TRANSFORMER ON 04/23 | * | |
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
Quad Cities 2 | 96 | 100% ELECTRICAL CAPABILITY |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 90 | INCREASING POWER | * | ||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 78 | HOLDING POWER FOR TESTING | * | ||
Cooper | 0 | 04/11/2008 | REFUELING OUTAGE | ||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 0 | 04/19/2008 | REFUELING OUTAGE | * | |
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 0 | 03/28/2008 | DEFUELED | ||
Palo Verde 3 | 100 | ||||
River Bend 1 | 100 | ||||
San Onofre 2 | 99 | ||||
San Onofre 3 | 0 | 04/16/2008 | PLANNED SHUTDOWN IN ORDER TO CONSERVE FUEL FOR SUMMER LOADS - WILL MAINTAIN UNIT IN MODE 3 (HOT STANDBY) | ||
South Texas 1 | 0 | 03/29/2008 | REFUELING OUTAGE | * | |
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 0 | 03/17/2008 | REFUELING OUTAGE |