The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for April 19, 2008

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 0 04/14/2008 REFUELING OUTAGE    
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 99   COASTDOWN TO REFUELING OUTAGE *  
Hope Creek 1 100   500 KV LINE #5021 OOS    
Indian Point 2 0 03/23/2008 EXITING REFUELING OUTAGE. *  
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 0 04/05/2008 DEFUELED    
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 88   INCREASING POWER *  
Oyster Creek 92   HOLDING POWER FOR CONTROL VALVE OSCILLATION PROBLEM AND FEEDWATER HEATER ISSUES *  
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100   500 KV LINE OOS FOR MAINTENANCE    
Salem 2 0 03/11/2008 DEFUELED - 500 KV LINE OOS FOR MAINTENANCE    
Seabrook 1 0 03/31/2008 345 KV (BUS 2) OOS    
Susquehanna 1 65   HOLDING POWER FOR TESTING *  
Susquehanna 2 100   VOLTAGE REGULATOR IN MANUAL    
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 0 03/18/2008 REFUELING OUTAGE    
Brunswick 1 0 03/14/2008 REFUELING OUTAGE    
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 88   ROD PATTERN ADJUSTMENT *  
Hatch 2 100        
McGuire 1 100        
McGuire 2 58   INCREASING POWER *  
North Anna 1 100        
North Anna 2 100        
Oconee 1 0 04/11/2008 REFUELING OUTAGE    
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 92   COASTDOWN TO REFUELING OUTAGE    
Summer 99   INCREASING POWER *  
Surry 1 0 04/16/2008 MAINTENANCE OUTAGE - SHUTDOWN TO REPAIR FEEDWATER HEATER    
Surry 2 98   COASTDOWN TO REFUELING *  
Turkey Point 3 100        
Turkey Point 4 0 03/30/2008 DEFUELED    
Vogtle 1 0 03/15/2008 REFUELING OUTAGE    
Vogtle 2 98   100% ELECTRICAL CAPABILITY.    
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 89   COASTDOWN TO REFUELING OUTAGE *  
Byron 1 89   HOLDING POWER FOR PRECONDITIONING *  
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY *  
D.C. Cook 1 0 03/25/2008 REFUELING OUTAGE - UNUSUAL EVENT DECLARED (2) FOR SEISMIC ACTIVITY - SEE EVENT # 44147 *  
D.C. Cook 2 100   UNUSUAL EVENT DECLARED (2) FOR SEISMIC ACTIVITY - SEE EVENT # 44147 *  
Davis-Besse 100        
Dresden 2 98   100% ELECTRICAL CAPABILITY    
Dresden 3 98   100% ELECTRICAL CAPABILITY *  
Duane Arnold 98   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 0 03/28/2008 DEFUELED    
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100   UNUSUAL EVENT DECLARED FOR SEISMIC ACTIVITY - SEE EVENT # 44148 *  
Perry 1 100        
Point Beach 1 100   GRID VOLTAGE IS EXPECTED TO DIP WHEN KEWAUNEE ENERGIZES NEW TRANSFORMER ON 04/19 *  
Point Beach 2 0 04/05/2008 REFUELING OUTAGE - TRANSFORMERS 2X03 & 2X04 OOS - GRID VOLTAGE IS EXPECTED TO DIP WHEN KEWAUNEE ENERGIZES NEW TRANSFORMER ON 04/19 *  
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 97   100% ELECTRICAL CAPABILITY    
Quad Cities 2 97   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 1   LOW POWER PHYSICS TESTING IN PROGRESS - REACTOR CRITICAL IN THE INTERMEDIATE RANGE *  
Cooper 0 04/11/2008 REFUELING OUTAGE    
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 0 03/28/2008 DEFUELED    
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 99        
San Onofre 3 0 04/16/2008 PLANNED SHUTDOWN IN ORDER TO CONSERVE FUEL FOR SUMMER LOADS - WILL MAINTAIN UNIT IN MODE 3 (HOT STANDBY)    
South Texas 1 0 03/29/2008 REFUELING OUTAGE    
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 0 03/17/2008 REFUELING OUTAGE    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021