The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for April 10, 2008

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 73   INCREASING POWER *  
Ginna 100        
Hope Creek 1 100        
Indian Point 2 0 03/23/2008 REFUELING OUTAGE    
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 0 04/05/2008 REFUELING OUTAGE *  
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 0 03/21/2008 REFUELING OUTAGE    
Oyster Creek 92   HOLDING POWER FOR CONTROL VALVE OSCILLATION PROBLEM AND FEEDWATER HEATER ISSUES    
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100   500 KV LINE OOS FOR MAINTENANCE    
Salem 2 0 03/11/2008 DEFUELED 500 KV LINE OOS FOR MAINTENANCE    
Seabrook 1 0 03/31/2008 REFUELING OUTAGE    
Susquehanna 1 0 03/03/2008 REFUELING OUTAGE *  
Susquehanna 2 100   VOLTAGE REGULATOR IN MANUAL    
Three Mile Island 1 100        
Vermont Yankee 100     *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100   500KV (LIMESTONE) LINE OOS FOR TRANSFORMER MAINTENANCE ON 4/10 *  
Browns Ferry 2 100   500KV (LIMESTONE) LINE OOS FOR TRANSFORMER MAINTENANCE ON 4/10 *  
Browns Ferry 3 0 03/18/2008 REFUELING OUTAGE. 500KV (LIMESTONE) LINE OOS FOR TRANSFORMER MAINTENANCE ON 4/10 *  
Brunswick 1 0 03/14/2008 REFUELING OUTAGE    
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 99   PROCEDURAL LIMIT    
Hatch 2 100        
McGuire 1 100        
McGuire 2 0 03/01/2008 COMING OUT OF REFUELING OUTAGE *  
North Anna 1 100        
North Anna 2 100        
Oconee 1 73   HOLDING POWER UNTIL OUTAGE; 1A1 RCP SHUT DOWN    
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100     *  
Sequoyah 1 100        
Sequoyah 2 99   COASTDOWN TO REFUELING OUTAGE *  
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 0 03/30/2008 REFUELING OUTAGE - DEFUELED    
Vogtle 1 0 03/15/2008 REFUELING OUTAGE; RAT 1A OOS *  
Vogtle 2 98   100% ELECTRICAL CAPABILITY.    
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 0 03/23/2008 REFUELING OUTAGE *  
Byron 2 100        
Clinton 96   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 0 03/25/2008 DEFUELED *  
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 98   100% ELECTRICAL CAPABILITY *  
Dresden 3 99   100% ELECTRICAL CAPABILITY *  
Duane Arnold 98   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 0 03/28/2008 REFUELING OUTAGE    
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 0 04/03/2008 PLANNED MAINTENANCE OUTAGE    
Point Beach 1 100     *  
Point Beach 2 0 04/05/2008 REFUELING OUTAGE - TRANSFORMER 2XO4 OOS *  
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 97   100% ELECTRICAL CAPABILITY    
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 0 03/16/2008 REFUELING OUTAGE - HEATUP IN PROGRESS *  
Callaway 100     *  
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 0 03/29/2008 REFUELING OUTAGE - CORE RELOADED *  
Cooper 83   COASTDOWN TO REFUELING OUTAGE *  
Diablo Canyon 1 100        
Diablo Canyon 2 0 02/03/2008 REFUELING OUTAGE - CURRENTLY INCREASING TO NOP/NOT *  
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 0 03/28/2008 DEFUELED *  
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 99        
San Onofre 3 100     *  
South Texas 1 0 03/29/2008 DEFUELED *  
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 0 03/17/2008 DEFUELED *  

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021