Power Reactor Status Report for March 8, 2008
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 0 | 02/22/2008 | REFUELING OUTAGE | * | |
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 100 | ||||
| Ginna | 100 | ||||
| Hope Creek 1 | 80 | REDUCED POWER FOR PLANNED MAINTENANCE AND SCRAM TIME TESTING - ANTICIPATED COMPLETION AT 1600 EST ON 3/8 WITH RESTORATION 5 HOURS LATER | * | ||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 0 | 02/29/2008 | REFUELING OUTAGE | ||
| Limerick 2 | 100 | ||||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 92 | HOLDING POWER FOR CONTROL VALVE OSCILLATION PROBLEM | * | ||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 100 | ||||
| Salem 2 | 87 | COASTDOWN TO REFUELING OUTAGE | |||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 0 | 03/03/2008 | REFUELING OUTAGE | ||
| Susquehanna 2 | 100 | VOLTAGE REGULATOR IN MANUAL | |||
| Three Mile Island 1 | 100 | POTENTIAL FLOOD STAGE AT 1800 HRS ON 3/9. | * | ||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | 500 KV UNION LINE OOS | |||
| Browns Ferry 2 | 100 | 500 KV UNION LINE OOS | |||
| Browns Ferry 3 | 97 | 500 KV UNION LINE OOS COASTDOWN TO REFUELING OUTAGE | * | ||
| Brunswick 1 | 92 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Brunswick 2 | 89 | FUEL PRECONDITIONING AND ROD SET IN PROGRESS | * | ||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 0 | 03/01/2008 | DROP LINE WELD REPAIR IN PROGRESS | * | |
| Farley 1 | 100 | ||||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 0 | 02/03/2008 | REFUELING OUTAGE | ||
| Hatch 2 | 0 | 03/07/2008 | AUTOMATIC REACTOR SCRAM WITH HPCI/RCIC ACTUATION DUE TO LOSS OF CONDENSATE FEEDWATER - SEE EN # 44046 | * | 1 |
| McGuire 1 | 100 | ||||
| McGuire 2 | 0 | 03/01/2008 | REFUELING OUTAGE | ||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 73 | 1A RCP SHUT DOWN | |||
| Oconee 2 | 100 | ||||
| Oconee 3 | 90 | INCREASING POWER FOLLOWING TURBINE VALVE TESTING | * | ||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | TORNADO WATCH FOR ST. LUCIE COUNTY | * | ||
| Saint Lucie 2 | 100 | TORNADO WATCH FOR ST. LUCIE COUNTY | * | ||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 95 | COASTDOWN TO REFUELING OUTAGE - 100% ELECTRICAL CAPABILITY - TG VOLTAGE REGULATOR IN MANUAL | |||
| Vogtle 2 | 98 | 100% ELECTRICAL CAPABILITY | |||
| Watts Bar 1 | 0 | 02/10/2008 | DEFUELED |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 96 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 95 | REDUCED POWER DUE TO HIGH PRESSURE FW HEATER TRAIN 1 OOS | * | ||
| Dresden 2 | 98 | 100% ELECTRICAL CAPABILITY | |||
| Dresden 3 | 78 | ROD PATTERN ADJUSTMENT | * | ||
| Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY | |||
| Fermi 2 | 100 | * | |||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 100 | 345KV PALISADES-COOK #1 LINE (BACKFEED) AND 345KV PALISADES-COOK #2 (1 OF 6 REDUNDANT) LINES OOS SVC FOR MAINTENANCE UNTIL 3/8 | |||
| Perry 1 | 92 | REDUCED POWER FOR WEEKLY ROD EXERCISE | * | ||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 0 | 02/12/2008 | REFUELING OUTAGE | ||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 97 | 100% ELECTRICAL OUTPUT | |||
| Quad Cities 2 | 0 | 03/02/2008 | REFUELING OUTAGE |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 98 | REDUCED FOR TURBINE VALVE STROKE TESTING | * | ||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 94 | COASTDOWN TO REFUELING OUTAGE | |||
| Diablo Canyon 1 | 100 | MORRO-DIABLO 230 KV LINE (1 OF 4) OOS THRU 3/12 | |||
| Diablo Canyon 2 | 0 | 02/03/2008 | DEFUELED | ||
| Fort Calhoun | 80 | REDUCED POWER FOR CONDENSER CLEANING | * | ||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 13 | INCREASING POWER | * | ||
| San Onofre 2 | 99 | ||||
| San Onofre 3 | 95 | REDUCED POWER FOR TURBINE VALVE TESTING | * | ||
| South Texas 1 | 96 | COASTDOWN TO REFUELING OUTAGE | * | ||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021