The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for March 5, 2008

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100   SYS SVC STATION XFMR "1A" OOS ON 3/6 FOR TAP CHANGER ADJUST *  
Beaver Valley 2 100        
Calvert Cliffs 1 0 02/22/2008 REFUELING OUTAGE    
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100     *  
Indian Point 3 100     *  
Limerick 1 0 02/29/2008 REFUELING OUTAGE *  
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 92   TURBINE VALVE ISSUES AND FW HEATER OOS    
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100   S/D XFMR "X-13" OOS FOR MAINTENANCE *  
Salem 1 100        
Salem 2 89   COASTDOWN TO REFUELING OUTAGE *  
Seabrook 1 100        
Susquehanna 1 0 03/03/2008 REFUELING OUTAGE *  
Susquehanna 2 100   VOLTAGE REGULATOR IN MANUAL    
Three Mile Island 1 100   FLOOD WARNING IN EFFECT FOR NEXT 24 HRS *  
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100   500 KV UNION LINE OOS    
Browns Ferry 2 100   500 KV UNION LINE OOS    
Browns Ferry 3 98   500 KV UNION LINE OOS COASTDOWN TO REFUELING OUTAGE    
Brunswick 1 93   COASTDOWN TO REFUELING OUTAGE *  
Brunswick 2 21   PERFORM MAINTENANCE ACTIVITIES ON FEEDWATER HEATER VALVES *  
Catawba 1 100        
Catawba 2 100        
Crystal River 3 0 03/01/2008 SCHEDULED REPAIR TO RCP SEAL    
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 0 02/03/2008 REFUELING OUTAGE *  
Hatch 2 100        
McGuire 1 100        
McGuire 2 0 03/01/2008 REFUELING OUTAGE *  
North Anna 1 100        
North Anna 2 100        
Oconee 1 73   1A RCP SHUT DOWN *  
Oconee 2 100     *  
Oconee 3 100     *  
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100     *  
Sequoyah 2 100     *  
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 97   COASTDOWN TO REFUELING OUTAGE - 100% ELECTRICAL CAPABILITY - TG VOLTAGE REGULATOR IN MANUAL *  
Vogtle 2 98   100% ELECTRICAL CAPABILITY    
Watts Bar 1 0 02/10/2008 DEFUELED    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 96   100% ELECTRICAL CAPABILITY *  
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100   ICE STORM MOVING THRU - POTENTIAL FOR GRID WARNINGS LATER TODAY *  
Dresden 2 98   100% ELECTRICAL CAPABILITY. SINGLE 345 KV LINE OOS - RING BUS COMPENSATING *  
Dresden 3 98   100% ELECTRICAL CAPABILITY    
Duane Arnold 98   100% ELECTRICAL CAPABILITY.    
Fermi 2 100   BROWNSTOWN-WAYNE 2 LINE (1 OF 3) OOS THRU 3/7    
Kewaunee 100        
La Salle 1 84   REDUCED POWER FOR BOP ACTIVITIES *  
La Salle 2 100        
Monticello 100        
Palisades 100   345KV PALISADES-COOK #1 LINE (BACKFEED) AND 345KV PALISADES-COOK #2 (1 OF 6 REDUNDANT) LINES OOS SVC FOR MAINTENANCE UNTIL 3/7 *  
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 0 02/12/2008      
Prairie Island 2 100        
Quad Cities 1 97   100% ELECTRICAL OUTPUT    
Quad Cities 2 0 03/02/2008 REFUELING OUTAGE *  

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 94   COASTDOWN TO REFUELING OUTAGE    
Diablo Canyon 1 100   MORRO-DIABLO 230 KV LINE (1 OF 4) OOS THRU 3/12    
Diablo Canyon 2 0 02/03/2008 DEFUELED    
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 54   HOLDING POWER WHILE RESOLVING ISSUES WITH HEATER DRAIN PUMPS *  
San Onofre 2 99        
San Onofre 3 100        
South Texas 1 98   COASTDOWN TO REFUELING OUTAGE *  
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021