Power Reactor Status Report for March 4, 2008
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 82 | REDUCED POWER FOR WATERBOX CLEANING - SYS SVC STATION XFMR "1A" OOS ON 3/6 FOR TAP CHANGER ADJUST | * | ||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 0 | 02/22/2008 | REFUELING OUTAGE | ||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 100 | ||||
| Ginna | 100 | ||||
| Hope Creek 1 | 100 | ||||
| Indian Point 2 | 100 | BACKUP 138KV LINE #95331 OOS TIL 1500 HRS ON 3/4 | * | ||
| Indian Point 3 | 100 | CROSS-TIE 138KV LINE #33332L&M OOS TIL 1500 ON 3/4 | * | ||
| Limerick 1 | 0 | 02/29/2008 | REFUELING OUTAGE - DRYWELL HEAD REMOVED/RV HEAD DETENSIONED | * | |
| Limerick 2 | 100 | ||||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 92 | TURBINE VALVE ISSUES AND FW HEATER OOS | |||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | S/D XFMR "X-13" WILL BE COMPLETED ON 3/4 | * | ||
| Salem 1 | 100 | ||||
| Salem 2 | 90 | COASTDOWN TO REFUELING OUTAGE | |||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 0 | 03/03/2008 | ENTERING REFUELING OUTAGE | * | |
| Susquehanna 2 | 100 | VOLTAGE REGULATOR IN MANUAL | |||
| Three Mile Island 1 | 100 | FLOOD WARNING IN EFFECT FOR NEXT 36 HRS | * | ||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | 500 KV UNION LINE OOS | |||
| Browns Ferry 2 | 100 | 500 KV UNION LINE OOS | |||
| Browns Ferry 3 | 98 | 500 KV UNION LINE OOS COASTDOWN TO REFUELING OUTAGE | |||
| Brunswick 1 | 94 | COASTDOWN TO REFUELING OUTAGE | |||
| Brunswick 2 | 74 | REDUCED TO REPAIR STEAM LEAK ON EXTRACTION LINE | * | ||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 0 | 03/01/2008 | SCHEDULED REPAIR TO RCP SEAL | ||
| Farley 1 | 100 | ||||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 0 | 02/03/2008 | REFUELING OUTAGE | ||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 0 | 03/01/2008 | SCHEDULED REFUELING OUTAGE | ||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 73 | 1A RCP SHUT DOWN - MAY ENTER ADVERSE WEATHER PROCEDURES THIS MORNING DUE TO PROJECTED STORM PATH | * | ||
| Oconee 2 | 100 | MAY ENTER ADVERSE WEATHER PROCEDURES THIS MORNING DUE TO PROJECTED STORM PATH | * | ||
| Oconee 3 | 100 | MAY ENTER ADVERSE WEATHER PROCEDURES THIS MORNING DUE TO PROJECTED STORM PATH | * | ||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | TORNADO WATCH IN EFFECT TIL 0900 CST | * | ||
| Sequoyah 2 | 100 | TORNADO WATCH IN EFFECT TIL 0900 CST | * | ||
| Summer | 100 | * | |||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | * | |||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 97 | 100% ELECTRICAL CAPABILITY - TG VOLTAGE REGULATOR IN MANUAL | * | ||
| Vogtle 2 | 98 | 100% ELECTRICAL CAPABILITY | * | ||
| Watts Bar 1 | 0 | 02/10/2008 | DEFUELED |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 96 | 100% ELECTRICAL CAPABILITY - 345KV LINE 4545 WILL BE OOS FROM 0800 3/5 TO 1500 3/6. | * | ||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 100 | ||||
| Dresden 2 | 98 | 100% ELECTRICAL CAPABILITY. SINGLE 345 KV LINE OOS | * | ||
| Dresden 3 | 98 | 100% ELECTRICAL CAPABILITY | |||
| Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY. | |||
| Fermi 2 | 100 | BROWNSTOWN-WAYNE 2 LINE (1 OF 3) OOS THRU 3/7 | |||
| Kewaunee | 100 | ||||
| La Salle 1 | 96 | INCREASING POWER | * | ||
| La Salle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 100 | FRONT BUS WILL BE OOS FOR MAINTENANCE ON 3/4 | * | ||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 0 | 02/12/2008 | |||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 97 | 100% ELECTRICAL OUTPUT | |||
| Quad Cities 2 | 0 | 03/02/2008 | ENTERING REFUELING OUTAGE | * |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 94 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Diablo Canyon 1 | 100 | MORRO-DIABLO 230 KV LINE (1 OF 4) OOS THRU 3/12 | |||
| Diablo Canyon 2 | 0 | 02/03/2008 | DEFUELED | ||
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | * | |||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 28 | INCREASING POWER | * | ||
| San Onofre 2 | 99 | ||||
| San Onofre 3 | 100 | ||||
| South Texas 1 | 99 | COASTDOWN TO REFUELING OUTAGE | * | ||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 |