Power Reactor Status Report for January 31, 2008
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 90 | INCREASING POWER AFTER ROD PATTERN ADJUSTMENT | * | ||
| Ginna | 100 | UNUSUAL EVENT - SEE EN #43944 | * | ||
| Hope Creek 1 | 100 | ||||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 97 | COASTDOWN TO REFUELING OUTAGE | |||
| Limerick 2 | 100 | ||||
| Millstone 2 | 100 | "D" CIRC WATER PUMP OOS. | |||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 92 | HOLDING POWER INDEFINITELY DUE TO TURBINE CONTROL VALVE ISSUE | |||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 100 | ||||
| Salem 2 | 100 | ||||
| Seabrook 1 | 1 | START UP IN-PROGRESS, BELOW THE POWER RANGE | * | ||
| Susquehanna 1 | 100 | ||||
| Susquehanna 2 | 100 | VOLTAGE REGULATOR IN MANUAL | |||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | ||||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 100 | ||||
| Brunswick 1 | 100 | COASTDOWN TO REFUELING OUTAGE FEEDWATER TEMPERATURE REDUCTION TO MAINTAIN 100% POWER | * | ||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 98 | HOLDING POWER - PREPARING TO IMPLEMENT POWER UPRATE | |||
| Farley 1 | 100 | ||||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 90 | COASTDOWN TO REFUELING OUTAGE CONDENSATE PUMP TRIP | * | ||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 0 | 01/29/2008 | REDUCED INVENTORY TO PERFORM MAINTENANCE ON RCPS | * | |
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 0 | 01/24/2008 | FORCED OUTAGE | ||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
| Vogtle 2 | 98 | 100% ELECTRICAL CAPABILITY | |||
| Watts Bar 1 | 99 | TWO WATTS BAR HYDRO SWITCHYARD 161KV CONTINGENCY LINES OOS INCREASING POWER AFTER SECONDARY PLANT MAINTENANCE | * |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 0 | 01/11/2008 | REFUELING OUTAGE | * | |
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 0 | 12/29/2007 | REFUELING OUTAGE | ||
| Dresden 2 | 97 | 100% ELECTRICAL CAPABILITY | |||
| Dresden 3 | 97 | 100% ELECTRICAL CAPABILITY | |||
| Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY. | |||
| Fermi 2 | 100 | * | |||
| Kewaunee | 100 | * | |||
| La Salle 1 | 76 | INCREASING POWER | * | ||
| La Salle 2 | 100 | * | |||
| Monticello | 100 | ||||
| Palisades | 100 | * | |||
| Perry 1 | 100 | ||||
| Point Beach 1 | 0 | 01/16/2008 | FORCED OUTAGE - TRANSFORMER REPAIR IN PROGRESS | * | |
| Point Beach 2 | 100 | * | |||
| Prairie Island 1 | 95 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
| Quad Cities 2 | 96 | 100% ELECTRICAL CAPABILITY |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | RECIRC PUMPS IN MANUAL | |||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | 230KV MORRO BAY-MIDWAY LINE OOS TIL MID MARCH | |||
| Diablo Canyon 2 | 95 | COASTDOWN TO REFUELING OUTAGE - 230KV MORRO BAY-MIDWAY LINE OOS TIL MID MARCH | |||
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | PLANNED MAINTENANCE ON THE STARTUP TRANSFORMER - ESTIMATED COMPLETION 2/2/08. | |||
| Palo Verde 2 | 100 | PLANNED MAINTENANCE ON THE STARTUP TRANSFORMER - ESTIMATED COMPLETION 2/2/08. | |||
| Palo Verde 3 | 100 | PLANNED MAINTENANCE ON THE STARTUP TRANSFORMER - ESTIMATED COMPLETION 2/2/08. | |||
| River Bend 1 | 0 | 01/06/2008 | DEFUELED FOR CHEMICAL CLEANING | ||
| San Onofre 2 | 98 | ADMINISTRATIVE LIMIT BASED ON STEAM GENERATOR LIMITATIONS | |||
| San Onofre 3 | 100 | ||||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 |