The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for January 30, 2008

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100     *  
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 97   COASTDOWN TO REFUELING OUTAGE    
Limerick 2 100        
Millstone 2 100   "D" CIRC WATER PUMP OOS.    
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 92   HOLDING POWER INDEFINITELY DUE TO TURBINE CONTROL VALVE ISSUE    
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 0 01/19/2008 FORCED OUTAGE *  
Susquehanna 1 100        
Susquehanna 2 100   VOLTAGE REGULATOR IN MANUAL    
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 98   COASTDOWN TO REFUELING OUTAGE    
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 98   HOLDING POWER - PREPARING TO IMPLEMENT POWER UPRATE    
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 96   COASTDOWN TO REFUELING OUTAGE    
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 0 01/29/2008 UNIT CHANGING TO MODE 5 IAW TECH SPEC SOON DUE TO 0.22 GPM RCS LEAK IN CONTAINMENT *  
Sequoyah 1 100        
Sequoyah 2 100        
Summer 0 01/24/2008 FORCED OUTAGE    
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 97   100% ELECTRICAL CAPABILITY    
Vogtle 2 98   100% ELECTRICAL CAPABILITY    
Watts Bar 1 100   TWO WATTS BAR HYDRO SWITCHYARD 161KV CONTINGENCY LINES OOS    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 0 01/11/2008 REFUELING OUTAGE - CORE ALTERATIONS COMPLETED    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 0 12/29/2007 REFUELING OUTAGE    
Dresden 2 97   100% ELECTRICAL CAPABILITY    
Dresden 3 97   100% ELECTRICAL CAPABILITY    
Duane Arnold 98   100% ELECTRICAL CAPABILITY.    
Fermi 2 100   HIGH WIND ADVISORY UNTIL NOON *  
Kewaunee 100   WINTER STORM WARNING UNTIL 0800 *  
La Salle 1 55   REDUCED POWER FOR CONTROL ROD AND POWER SUPPRESSION TESTING    
La Salle 2 82   MAINTENANCE ON TURBINE CONTROL VALVE #1 *  
Monticello 100        
Palisades 100   HIGH WINDS *  
Perry 1 100        
Point Beach 1 0 01/16/2008 FORCED OUTAGE - TRANSFORMER REPAIR IN PROGRESS 1 OF 4 345KV LINES TRIPPED *  
Point Beach 2 100   1 OF 4 345KV LINES TRIPPED *  
Prairie Island 1 98   COASTDOWN TO REFUELING OUTAGE    
Prairie Island 2 100        
Quad Cities 1 97   100% ELECTRICAL CAPABILITY    
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100   RECIRC PUMPS IN MANUAL *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100   230KV MORRO BAY-MIDWAY LINE OOS TIL MID MARCH    
Diablo Canyon 2 95   COASTDOWN TO REFUELING OUTAGE - 230KV MORRO BAY-MIDWAY LINE OOS TIL MID MARCH *  
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100   PLANNED MAINTENANCE ON THE STARTUP TRANSFORMER - ESTIMATED COMPLETION 2/2/08.    
Palo Verde 2 100   PLANNED MAINTENANCE ON THE STARTUP TRANSFORMER - ESTIMATED COMPLETION 2/2/08.    
Palo Verde 3 100   PLANNED MAINTENANCE ON THE STARTUP TRANSFORMER - ESTIMATED COMPLETION 2/2/08.    
River Bend 1 0 01/06/2008 DEFUELED FOR CHEMICAL CLEANING *  
San Onofre 2 98   ADMINISTRATIVE LIMIT BASED ON STEAM GENERATOR LIMITATIONS *  
San Onofre 3 100        
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.