Power Reactor Status Report for November 14, 2007
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | * | |||
Ginna | 100 | ||||
Hope Creek 1 | 8 | HOLDING POWER FOR DIGITAL FEEDWATER SYSTEM WORK | |||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | * | |||
Millstone 3 | 100 | * | |||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 0 | 11/03/2007 | MAINTENANCE OUTAGE, DRYWELL HEAD OFF | ||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | STARTUP SOURCE 343 OOS | |||
Peach Bottom 3 | 100 | STARTUP SOURCE 343 OOS | |||
Pilgrim 1 | 100 | LINE 342 AT PARTIAL CAPACITY - IF OTHER 345KV LINE IS LOST ISO WILL REQUEST REDUCTION TO 500 MWE | |||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | POWER REDUCTION THREAT DUE TO GRID WORK IN NEW YORK UNTIL JANUARY | |||
Susquehanna 1 | 100 | ||||
Susquehanna 2 | 100 | VOLTAGE REGULATOR IN MANUAL | |||
Three Mile Island 1 | 0 | 10/21/2007 | REFUELING OUTAGE | ||
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 13 | 1 OF 7 500 KV TRANSMISSION LINES OOS FOR MAINTENANCE AND LIMESTONE INTERBANK TIE LINE OOS. HOLDING POWER LEVEL FOR LEAK REPAIRS. | * | ||
Browns Ferry 2 | 100 | 1 OF 7 500 KV TRANSMISSION LINES OOS FOR MAINTENANCE AND LIMESTONE INTERBANK TIE LINE OOS. | |||
Browns Ferry 3 | 100 | 1 OF 7 500 KV TRANSMISSION LINES OOS FOR MAINTENANCE AND LIMESTONE INTERBANK TIE LINE OOS. | |||
Brunswick 1 | 100 | ||||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 0 | 09/14/2007 | EXITING REFUELING OUTAGE | ||
Crystal River 3 | 0 | 11/02/2007 | REFUELING OUTAGE - DEFUELED | * | |
Farley 1 | 30 | INCREASING POWER | * | ||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 0 | 10/26/2007 | DEFUELED | ||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 0 | 09/30/2007 | DEFUELED | ||
Sequoyah 1 | 0 | 10/03/2007 | REFUELING OUTAGE | ||
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 0 | 10/20/2007 | REFUELING OUTAGE | ||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | * | |||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 98 | 100% ELECTRICAL CAPABILITY | * | ||
Vogtle 2 | 98 | 100% ELECTRICAL CAPABILITY | |||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | ||||
Dresden 2 | 0 | 10/28/2007 | REFUELING OUTAGE | ||
Dresden 3 | 99 | 100% ELECTRICAL CAPABILITY | |||
Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY | |||
Fermi 2 | 2 | INCREASING POWER | * | ||
Kewaunee | 100 | ||||
La Salle 1 | 93 | COASTDOWN TO REFUELING OUTAGE | |||
La Salle 2 | 100 | ||||
Monticello | 81 | INCREASING POWER FOLLOWING ROD ADJUSTMENT | * | ||
Palisades | 100 | ||||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | ||||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | 161 KV BUS OOS FOR MAINTENANCE | * | ||
Prairie Island 2 | 100 | 161 KV BUS OOS FOR MAINTENANCE | * | ||
Quad Cities 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
Quad Cities 2 | 97 | 100% ELECTRICAL CAPABILITY |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 0 | 09/29/2007 | DEFUELED | ||
River Bend 1 | 75 | HOLDING FOR SCHEDULED MAINTENANCE | |||
San Onofre 2 | 97 | S/G LIMITATIONS | |||
San Onofre 3 | 99 | * | |||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Thursday, March 25, 2021